Similar Projects
Addition to Existing Athletics for Hartselle High School
Addition
Bidding
Hartselle, AL 35640

Lawrence County Athletic Facilities at Various Schools
New Construction
Bidding
Moulton, Town Creek, Trinity, AL 35672

Hitting Facility
New Construction
Post-Bid
Less than $350,000 est. value
Enterprise, AL

Sand Mountain Park and Amphitheater Miracle League Field
Post-Bid
Albertville, AL 35950

Orange Beach Recreation Complex New Gymnasium
New Construction
Results
Less than $1,263,674 est. value
Orange Beach, AL

Tuscaloosa County High School Softball Fieldhouse
Results
Less than $658,000 est. value
Northport, AL 35475

New Baseball and Softball Complex for Enterprise City Schools
Construction
Enterprise, AL 36330

Arab High School Football Field
Renovation
Bidding
Arab, AL 35016

Calera Sports Track and Field Building Project
Post-Bid
Calera, AL 35040

New Softball Concession Stand
New Construction
Results
Talladega, AL 35160

Calera Track and Field Completion Project
Post-Bid
Calera, AL 35040

New Baseball and Softball Fields for Cleveland High School Package B - Field-Complex Fit Out
Results
Cleveland, AL 35049

New Baseball Training Facility
New Construction - 9,900 SF
Post-Bid
Less than $439,000 est. value
Dothan, AL

Etowah County Mega Sports Complex
Results
Less than $5,079,798 est. value
AL

Summerdale Tennis Complex
Post-Bid
Less than $310,000 est. value
Summerdale, AL

Last Updated 02/23/2021 11:04 PM
Project Title

Athletic Complex - Elevator Repairs and Modernization

Physical Address View project details and contacts
City, State (County) Auburn, AL 36849   (Lee County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of the work includes but is not limited to: Bolster and solidify the Athletics Complex hydraulic passenger elevator by updating the necessary mechanical components, the cab and the cab finishes and interior.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Operation and Maintenance of Elevators, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents