Similar Projects
CDBG - Sidewalk Improvements in Woodland Acres Subdivision
Infrastructure
Bidding
$200,000 est. value
Kennesaw, GA 30152

CVS #4740 Partial ADA Project
Renovation
Post-Bid
Smyrna, GA 30080

CVS #2147 Partial ADA Project
Renovation
Post-Bid
Kennesaw, GA 30152

Fiberglass Reinforced Polymer Walking Surface
Results
Atlanta, GA

Buckner Road Sidewalk
Results
Marietta, GA

General Infrastructure Construction Services for Minor Projects
Post-Bid
Marietta, GA

Kennesaw Avenue Streetscapes
Results
Marietta, GA 30006

Hotel Street - Sidewalk
Infrastructure
Post-Bid
Austell, GA 30106

Cameron Springs Repairs and Improvements Project
Results
Powder Springs, GA

Manget Street at Lakewood Drive Intersection Improvements
Results
Marietta, GA

Paving at Marietta Middle School Parking Lot
Term Contract, Infrastructure
Results
$115,055 est. value
Marietta, GA 30064

Annual Contract for Maintenance Repairs of Sidewalks Curbs Driveways Aprons
Infrastructure
Results
Atlanta, GA

Bouldercrest Drive Sidewalk Enhancement
Infrastructure
Results
$153,176 est. value
Marietta, GA 30064

Mountain Brook Sidewalk Access
Infrastructure
Results
$189,500 est. value
Marietta, GA 30064

Burnt Hickory Road Sidewalk Improvements Water and Sanitary Sewer Relocation
Infrastructure
Results
$100,000 est. value
Marietta, GA 30067

Last Updated 04/15/2022 12:48 PM
Project Title

Church Road Sidewalk

Physical Address View project details and contacts
City, State (County) GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of the furnishing of all materials, labor, equipment and other things necessary for the complete construction of: Church Road Sidewalk consists of adding a five-foot wide sidewalk along the north side of Church Road, from Harris Road to Gray Road, and filling in gaps between existing sidewalk. The project also includes the update of site conditions and existing ramps to ensure compliance with Americans with Disabilities Act requirements. The total length of the project is estimated at 1.00 mile. Pre-Bid Meeting Link: https://cobbcounty.webex.com/cobbcounty/j.php?MTID=m94c5a2a0b4c94a1e608ea2c3bc7a1c5d, Meeting number: 2309 835 1272 Password: bYdp4R9UTH6 Join by video system Dial 23098351272@cobbcounty.webex.com You can also dial 173.243.2.68 and enter your meeting number. Join by phone +1-415-655-0003 US Toll Access code: 230 983 51272

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents