Similar Projects
Rehabilitation of Bridge 04105 Memorial Boulevard Over Pequabuck River
Bidding
Bristol, CT 06010

Rental of Bridge Repair Units
Bidding
Hartford, CT

Replacement of Bridge No. 03023 Sigourney Street over Capitol Ave
Post-Bid
$10,000,000 to $14,999,999 est. value
Hartford, CT 06105

Riverside Road and Drake Hill Road Pavement Rehabilitation and Bridge Repairs at Bridge No. 05637
Results
Less than $481,138 est. value
Simsbury, CT 06070

Rehabilitation of the Approach Spans for Arrigoni Bridge No. 00524
Results
$40,000,000 to $59,999,999 est. value

Replacement of Bridge No. 05650, South Main Street 1 over Fawn Brook
Results
$1,000,000 to $2,499,999 est. value
Marlborough, CT

Jones Hollow Road over Blackledge River - Replacement of Bridge No. 04450
Results
Less than $1,521,412 est. value
Marlborough, CT

Replacement of Bridge No. 04514 - Fisher Hill Road over Roaring Brook Contract
Results
Less than $1,631,331 est. value
Glastonbury, CT

Rehabilitation of Bridge No. 00980B; I-84 TR 826 over Connecticut River
Results
$1,000,000 to $2,499,999 est. value
Hartford, CT 06101

Replacement of Bridge No. 04819, Remington Street over Stony Brook
Results
Suffield, CT

Rehabilitation of Bridge No.06026 Route 156 over Niantic River
Results
$15,000,000 to $19,999,999 est. value
Waterford, CT 06385

Rehabilitation of Bridge No. 03295, Route 190 Over Connecticut River
Results
$5,000,000 to $7,499,999 est. value
Enfield, Suffield, CT 06078

Rehabilitation of Bridge Nos. 01487 and 03245, Route 177 over Farmington River
Results
$1,000,000 to $2,499,999 est. value
Farmington, CT 06032

Replacement of Bridge No. 04480, Louisiana Avenue over Coppermine Brook
Results
Bristol, CT 06010

Preservation of Bridge Nos. 04476, 05224, 06122 and 06123
Results
Berlin, CT 06037

Last Updated 03/11/2020 12:01 PM
Project Title

Replacement of Bridge No. 04147 Hartford Road Over Hop Brook

Physical Address View project details and contacts
City, State (County) Manchester, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract includes the complete removal of an existing two span concrete and brick arch structure and the construction of a new, single span steel girder and reinforced concrete deck structure at Hartford Road over Hop Brook. It includes other appurtenant work such as water handling; utility coordination; installation of concrete sidewalk, metal beam rail and water and sanitary sewer facilities; earthwork and turf establishment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents