Similar Projects
Water System Improvement
Infrastructure
Conception
Shelbyville, TN 37160

Water System Improvement
Infrastructure
Conception
Shelbyville, TN 37160

Correctional Complex Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$7,437,000 CJ est. value
Pikeville, TN 37367

Trek Thru Truth - Christian Discovery Museum
New Construction, Infrastructure - 75,000 SF
Design
$20,000,000 CJ est. value
Cleveland, TN 37311

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Johnsonville TVA Credit Union Addition / Camden
Addition, Demolition, Infrastructure
Bidding
$600,000 CJ est. value
Camden, TN 38320

Tennessee College of Applied Technology (TCAT) - Shelbyville Bedford County Higher Education Center
New Construction, Infrastructure - 105,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Shelbyville, TN 37160

Tennessee College of Applied Technology (TCAT) - Shelbyville Bedford County Higher Education Center
New Construction, Infrastructure - 105,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Shelbyville, TN 37160

Drain Cleaning on Various Interstate and State Routes
Term Contract
Post-Bid
Nashville, TN 37205

Drain Cleaning on Various Interstate and State Routes
Term Contract
Post-Bid
Nashville, TN 37205

New Career and Technical Education (CTE) Building at: Existing Eagleton College and Career Academy - Phase I
Renovation, Infrastructure
Results
$16,293,000 CJ est. value
Maryville, TN 37804

Construction of the HDPE Pipe Replacement Project Phase 1
Infrastructure
Results
$300,000 est. value
Cleveland, TN

Frogpond Road Subdivision
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Friendsville, TN 37737

The Ring to Target Beam Transport Stub Construction
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Oak Ridge, TN 37830

Splash Pad, Downtown Plan and Develop - City of Shelbyville
Infrastructure
Conception
$500,000 CJ est. value
Shelbyville, TN 37160

Last Updated 07/18/2023 10:07 AM
Project Title

Doe River Crossing Water Line Crossing

Physical Address View project details and contacts
City, State (County) Elizabethton, TN 37643   (Carter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

TN-19607-2019 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Morgan Contracting, Inc. is soliciting material, equipment, and subcontractor bids for the following work: Dewatering/Bypass Pumping, Aggregates, Concrete Materials, Pre/Post Videography/Photography, Erosion Control, Seeding & Mulching, Traffic Control Turnkey, Pavement/Concrete Work, CCTV/Cleaning, Pipe & Appurtenances, Clearing/Grubbing, Surveying, and Hauling among many other trades; for the Doe River Crossing Water Line Crossing in Elizabethton, TN Minority, Veteran-Owned, and Women Owned businesses are encouraged to submit bids/proposals for this work, but please consider bidding even if you are not a DBE. SUMMARY OF WORK The Project generally consists of the installation of approximately 2,600 linear feet of 12-inch restrained joint ductile iron pipe (a parallel installation) by open-cut method and installation of a proposed pipe hangar system on the existing State Route 37 bridge over the Doe River in the Valley Forge community. Also, included in the work is the installation of several gate and butterfly valves, a metering vault, fire hydrant, connections to existing 8-inch, 12-inch, and 16-inch CIP lines along State Route 37, Riverview Drive, and Howard Lipford Drive. 1.2 PROJECT PAYMENTS AND RETAINAGE A. The Owner may retain a portion of the amount otherwise due the Contractor. Except as provided elsewhere, the amount retained by the Owner shall be limited to the following: 1. Withholding of not more than 5% of the payment claimed until work is substantially complete. 2. When the work is substantially complete (operational or beneficial occupancy), the withheld amount may be further reduced below 5% to only that amount necessary to assure completion. 3. The Owner may accept securities negotiable without recourse, conditions or restrictions, a release of retainage bond or an irrevocable letter of credit provided by the Contractor in lieu of all or part of the cash retainage. B. For unit price projects, the Contractor shall use the "Unit Bid Item Summary" form included with these specifications. C. Sales Tax Statement: When requested by the Owner, each request for progress payment submitted by the Contractor shall include a sales tax reimbursement statement. The Contractor shall utilize the form provided with these specifications

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents