Similar Projects
Pawlak Park Improvements
Infrastructure
Design
$229,563 CJ est. value
Lorain, OH 44052

Pawlak Park Improvements
Infrastructure
Design
$229,563 CJ est. value
Lorain, OH 44052

City of Avon, New Construction of Park Restrooms
New Construction, Infrastructure
Bidding
$784,100 CJ est. value
Avon, OH 44011

Taco Bell - W River Road / Eylria
Demolition, New Construction, Infrastructure - 2,287 SF
Bidding
$700,000 CJ est. value
Elyria, OH 44035

Design Build – Playground Improvements and Walking Path
New Construction, Renovation
Post-Bid
Elyria, Lorain, North Olmsted, OH 44035

Tennis Courts
Renovation
Post-Bid
North Ridgeville, OH

East Park Playground Improvements Design Build
Results
Elyria, OH 44035

East Park Pavilion
New Construction - 1,560 SF
Results
Elyria, OH 44035

Sheffield Village Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Pending Verification
$24,340,000 CJ est. value
Sheffield Village, OH 44035

The LORCO - Cinnamon Lake Maintenance Building project
Demolition, New Construction, Infrastructure
Design
$3,327,000 CJ est. value
Wellington, OH 44090

Lorain County Job and Family Services Stormwater and Parking Lot Improvement Project
Infrastructure
Bidding
$897,156 CJ est. value
Elyria, OH 44035

2022 Parks and Recreation Improvements
Renovation
Post-Bid
$500,000 est. value
Elyria, OH

Toll Plaza 152 Expansion
Addition, Infrastructure
Results
$1,700,000 est. value
OH

Roadway Minor Rehab
Infrastructure
Design
$432,990 CJ est. value
Elyria, OH 44035

McAlister's Shell / Avon
New Construction, Infrastructure - 3,429 SF
Bidding
$1,000,000 CJ est. value
Avon, OH 44011

Last Updated 08/18/2022 04:01 PM
Project Title

RFP D/B - North Park Playground Improvements

Physical Address View project details and contacts
City, State (County) Elyria, OH 44035   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $112,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the design, layout and construction of new playground equipment at North Park in the City of Elyria. DESCRIPTION OF WORK: The Contractor shall furnish all labor, equipment, supplies, and supervision of labors necessary to complete the work. This project includes the design, layout and construction of new playground equipment at North Park in the City of Elyria, Ohio Questions will be received in writing to Kathryn McKillips, P.E. at kmckillips@cityofelyria.org SCOPE OF WORK A. OBJECTIVES Generally, the scope of work will include, but is not limited to, the following: Design, supply and install play equipment at North Park in one (1) location. This is a replacement installation for ages 5-12. Playground Equipment Requirements A. Minimum of 10 play elements. Preference will be given to designs that include the 3 elements in Exhibit A. B. Contractor shall provide design plan for the area. All design plans/drawings shall be in color. C. Contractor shall supply with proposal a complete description of the length and type of parts the warranty covers on all pieces of equipment D. Initial inspection of equipment shall be made within the week of installation. E. Replacement Parts Books and Instillation Instructions shall be supplied for all proposed playground components. F. The playground system will be a multi-colored system. Specific color combinations to be determined. G. The playground area should be designed for children ages 5-12 H. 2 Bay swing I. 5" poles to be used Existing playground area may be expanded, if needed, to include all elements K. Contractor to include mulch L. ADA accessible element Contractors shall meet manufacturer's specifications and industry standards for installation. Systems shall meet National Playground standards as referenced in the American Society for Testing and Materials (ASTM) document F1487-95; Standard Consumer Safety Performance Specification for Playground Equipment for Public Safety. Evidence of compliance shall be submitted and stamped on equipment as required

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents