Similar Projects
Last Updated | 06/01/2023 01:22 PM |
Project Title | Fort Vancouver HS Portable Classroom Addition |
Physical Address | View project details and contacts |
City, State (County) | Vancouver, WA 98661 (Clark County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $201,138 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | . Bids will be received as follows: General Contract to prepare the site at Fort Vancouver High School as described in Civil Engineer drawings and specs. This will include installation of erosion control measures, strippings and fine grading of the swale North of the modular. Provide and install compacted gravel underneath portable and install new footings under modulars as described in drawings from Modern Building Systems. Coordinate installation of modular buildings on new foundations by district vendor. Installation of new utilities (power, low voltage, storm drainage) and connect to new modular building. Minor modifications to the modulars, once moved to the site by owner's vendor includes: Adjusting of gutters to drain to the North end and reconnect to two existing downspouts attached to the walls. Remove and dispose of existing downspouts on opposite side, patch gutters, as necessary. GC to include any painting touch up on modulars, as needed, where contract work occurs. Existing ramp and stair assembly to be disassembled from existing modular location at Franklin Elementary School, relocated and re-assembled at Fort Vancouver High School. Construction of new walkways and landings as described in Civil Engineer drawings. All work will be under a single contract, to include coordination with owner provided vendor for relocation of the Modular Classroom unit Prospective bidders will be required to sign in as an account manager to have access to the project documents. Contact J2 BluePrint Plan Center regarding questions or setting up an account or viewing the documents. Printed sets or sheets may be purchased directly from the printer. No bid will be considered unless in complete accord with the instructions to bidders, and submitted upon the official proposal form included in the contract documents. Each bid must be accompanied by bid security in the form of a bid bond, certified bank check, or cashier's check executed in favor of the Owner for not less than 5 percent (%) of the basic bid amount, excluding applicable State of Washington taxes. Bid security shall be forfeited as damages should the bidder neglect or refuse to enter into a contract and provide a suitable bond for performance/payment for labor and materials. This project is considered a Public Works project. Attention of bidders is called to State of Washington statues, regulations and rules pertaining, but not limited to, the following public works projects: non-discrimination in employment and facilities; rates of payment for wages and fringe benefits to workers; forms of bids; bonds, contracts and certificates; restrictions of lien, taxes and retainage; and barrier-free facilities for the handicapped. The Owner reserves the right to waive any informalities and to reject any or all bids. No bidder may withdraw or modify his bid after the time set for the bid opening until after 45 calendar days from bid opening date. Summary Project Description: General Contract to prepare the site at Fort Vancouver High School as described in Civil Engineer drawings and specs. This will include installation of erosion control measures, strippings and fine grading of the swale North of the modular. Provide and install compacted gravel underneath portable and install new footings under modulars as described in drawings from Modern Building Systems. Coordinate installation of modular buildings on new foundations by district vendor. Installation of new utilities (power, low voltage, storm drainage) and connect to new modular building. Minor modifications to the modulars, once moved to the site by Owner's vendor includes: Adjusting of gutters to drain to the North end and reconnect to two existing downspouts attached to the walls. Remove and dispose of existing downspouts on opposite side, patch gutters, as necessary. GC to include any painting touch up on modulars, as needed, where contract work occurs. Existing ramp and stair assembly to be disassembled from existing modular location at Franklin Elementary School, relocated and re-assembled at Fort Vancouver High School. Construction of new walkways and landings as described in Civil Engineer drawings. All work will be under a single contract, to include coordination with owner provided vendor for relocation of the Modular Classroom unit. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |