Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

High School Addition
New Construction - 22,500 SF
Design
Ridgefield, WA

Cornerstone Christian Academy Middle/High School
Renovation
Design
Battle Ground, WA 98604

Chinook Elementary School Replacement
Renovation
Post-Bid
Vancouver, WA 98685

Evergreen Public Schools Mill Plain Elementary School Project
New Construction - 61,000 SF
Post-Bid
$28,000,000 est. value
Vancouver, WA 98684

Fort Vancouver High School Tenant Improvement
Renovation
Results
Vancouver, WA 98661

Fort Vancouver High School Score Tower
New Construction - 288 SF
Results
Vancouver, WA 98661

Vancouver Innovation Center
New Construction, Infrastructure, Build-out, Renovation - 930,000 SF
Pending Verification
$830,000,000 CJ est. value
Vancouver, WA 98683

Vancouver Innovation Center Middle School
New Construction
Design
Vancouver, WA 98683

ESD112 - 49th Center Renovation
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98682

Evergreen Public Schools at Home Choice Academy Renovation Project
Renovation - 88,000 SF
Results
$1,800,000 est. value
Vancouver, WA 98682

Skyview High School Tenant Improvement
Renovation
Post-Bid
$845,741 CJ est. value
Vancouver, WA 98685

Lincoln ES Tenant Improvement and Addition
Renovation, Addition
Results
Vancouver, WA 98660

Transportation Center Replacement
Renovation - 26,000 SF
Post-Bid
$17,500,000 CJ est. value
Vancouver, WA 98682

Green Mountain School Remodel and Additions
Renovation
Results
Woodland, WA 98674

Last Updated 06/01/2023 01:22 PM
Project Title

Fort Vancouver HS Portable Classroom Addition

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98661   (Clark County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $201,138 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

. Bids will be received as follows: General Contract to prepare the site at Fort Vancouver High School as described in Civil Engineer drawings and specs. This will include installation of erosion control measures, strippings and fine grading of the swale North of the modular. Provide and install compacted gravel underneath portable and install new footings under modulars as described in drawings from Modern Building Systems. Coordinate installation of modular buildings on new foundations by district vendor. Installation of new utilities (power, low voltage, storm drainage) and connect to new modular building. Minor modifications to the modulars, once moved to the site by owner's vendor includes: Adjusting of gutters to drain to the North end and reconnect to two existing downspouts attached to the walls. Remove and dispose of existing downspouts on opposite side, patch gutters, as necessary. GC to include any painting touch up on modulars, as needed, where contract work occurs. Existing ramp and stair assembly to be disassembled from existing modular location at Franklin Elementary School, relocated and re-assembled at Fort Vancouver High School. Construction of new walkways and landings as described in Civil Engineer drawings. All work will be under a single contract, to include coordination with owner provided vendor for relocation of the Modular Classroom unit Prospective bidders will be required to sign in as an account manager to have access to the project documents. Contact J2 BluePrint Plan Center regarding questions or setting up an account or viewing the documents. Printed sets or sheets may be purchased directly from the printer. No bid will be considered unless in complete accord with the instructions to bidders, and submitted upon the official proposal form included in the contract documents. Each bid must be accompanied by bid security in the form of a bid bond, certified bank check, or cashier's check executed in favor of the Owner for not less than 5 percent (%) of the basic bid amount, excluding applicable State of Washington taxes. Bid security shall be forfeited as damages should the bidder neglect or refuse to enter into a contract and provide a suitable bond for performance/payment for labor and materials. This project is considered a Public Works project. Attention of bidders is called to State of Washington statues, regulations and rules pertaining, but not limited to, the following public works projects: non-discrimination in employment and facilities; rates of payment for wages and fringe benefits to workers; forms of bids; bonds, contracts and certificates; restrictions of lien, taxes and retainage; and barrier-free facilities for the handicapped. The Owner reserves the right to waive any informalities and to reject any or all bids. No bidder may withdraw or modify his bid after the time set for the bid opening until after 45 calendar days from bid opening date. Summary Project Description: General Contract to prepare the site at Fort Vancouver High School as described in Civil Engineer drawings and specs. This will include installation of erosion control measures, strippings and fine grading of the swale North of the modular. Provide and install compacted gravel underneath portable and install new footings under modulars as described in drawings from Modern Building Systems. Coordinate installation of modular buildings on new foundations by district vendor. Installation of new utilities (power, low voltage, storm drainage) and connect to new modular building. Minor modifications to the modulars, once moved to the site by Owner's vendor includes: Adjusting of gutters to drain to the North end and reconnect to two existing downspouts attached to the walls. Remove and dispose of existing downspouts on opposite side, patch gutters, as necessary. GC to include any painting touch up on modulars, as needed, where contract work occurs. Existing ramp and stair assembly to be disassembled from existing modular location at Franklin Elementary School, relocated and re-assembled at Fort Vancouver High School. Construction of new walkways and landings as described in Civil Engineer drawings. All work will be under a single contract, to include coordination with owner provided vendor for relocation of the Modular Classroom unit.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents