Similar Projects
Last Updated | 01/12/2023 11:12 AM |
Project Title | MEWS Substation Storage Building - Bid Package 1 |
Physical Address | View project details and contacts |
City, State (County) | Mayfield, KY 42066 (Graves County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Site Development, Warehouse/Storage |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mayfield Electric & Water Systems (OWNER) will receive proposals through Codell Construction Company (Construction Manager as Contractor) to furnish all labor and materials to complete the MEWS Substation Storage Building located at 540 S. 16th Street, Mayfield, KY 42066. Proposals shall be presented through competitive sealed bidding. Contract shall be awarded to the responsive and responsible bidder. Contract shall be executed between the bidder and Codell Construction Company, the Construction Manager As Contractor. Each bid must be accompanied by a 5% Bid Bond. The bid will be submitted in duplicate on copies of the Form of Proposal located in the Volume One Project Manual Bidding and Contract Documents. Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project Name and Proposed Bid Package number affixed. No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. All questions related to the bidding documents should be directed to the Construction Manager As Constructor. Jason Cabbage Codell Construction Company 4475 Rockwell Road Winchester, KY 40391 PHONE: (859) 744-2222/FAX: (859) 744-2225 CELL: (859)644-2192 E-MAIL: jcabbage@codellconstruction.com The Project Schedule will be issued via addendum. The contract will include liquidated damages assessed at $1,000.00/day if the completion date is not met. Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project. The following bids are requested: BID PACKAGE 1 - Repair storage building to consist of removing all sheeting from roof and sides, remove insulation, removing bent wall girts and replacing with new ones, repair CMU wall, install new insulation, new side wall sheeting, new overhead door with motor. MAYFIELD ELECTRIC & WATER SYSTEMS AND CODELL CONSTRUCTION COMPANY Mayfield Electric & Water Systems reserves the right to reject all bids or waive any discrepancies within |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |