Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

RFP Engineering - Design Services for Playground Improvements - Emigh and Wick Playfields
Infrastructure
Bidding
$3,000,000 CJ est. value
Milwaukee, WI 53202

RFP Engineering - Potter Road and 109th Street Utilities and Paving Design
Infrastructure
Bidding
$500,000 CJ est. value
Wauwatosa, WI 53213

Engineering, Planning and Development
Post-Bid

Update Existing Engineering Data Documentation For Existing Mechanical Ventilation Systems
Term Contract
Post-Bid
Milwaukee, WI

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

UWMIL Central Heating Plant Chiller Replacement
Renovation
Design
$13,360,000 CJ est. value
Milwaukee, WI 53202

RFP Engineering - Perpetuation - Pavement Replacement
Infrastructure
Bidding
$10,000,000 CJ est. value
Milwaukee, WI 53204

Urban Design Services
Term Contract
Post-Bid
Milwaukee, WI

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

RFP Engineering - Perpetuation - Pavement Replacement
Infrastructure
Bidding
$4,000,000 CJ est. value
Oak Creek, WI 53154

2022 Alley Reconstruction Program Engineering and Inspection Services
Infrastructure
Post-Bid
Shorewood, WI

W Layton Ave (CTH Y) Reconstruction
Results
Greenfield, WI 53220

Last Updated 10/17/2022 07:02 PM
Project Title

RFP Engineering - Perpetuation - Resurfacing

Physical Address View project details and contacts
City, State (County) Franklin, WI 53132   (Milwaukee County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The pavement and structures need treatment to extend their service lives. 2040-23-00 Mill 4" and resurface 4" approximately 0.5 miles of STH 100 from STH 38 to Shepard Ave within the city of Oak Creek. Curb ramps will be evaluated for compliance. Signals will be fully reconstructed at STH 100 and Shepard Avenue with montubes, radar detection, and base-patch loops. Anticipated Construction Cost: $10,000,000-$10,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview:Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - SE-02 RFP Engineering - Perpetuation - Resurfacing

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents