Similar Projects
The Registry on Grass Lake
New Construction
Conception
Winter Garden, FL 34787

Gem Lake - Phase 1 Master Plan
New Construction
Conception
Maitland, FL 32751

Del Web Oasis
New Construction - 14,000 SF
Design
Winter Garden, FL 34787

Vintage Horizon West Apartment Complex
New Construction
Design
Winter Garden, FL 34787

Daryl Carter Apartments
New Construction
Post-Bid
Orlando, FL

Daryl Carter Apartments
New Construction
Post-Bid
Orlando, FL

Renovation of Cultural Community Center - Phase 1
Renovation
Results
Less than $1,700,000 est. value
Orlando, FL 32818

Multicultural Community Center
Renovation
Results
$4,200,000 est. value
Orlando, FL 32818

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

Boggy Creek Road Mixed-Use Development
New Construction
Pending Verification
$10,000,000 CJ est. value
Orlando, FL 32824

Stoneybrook Senior Independent & Assisted Living
New Construction
Conception
Winter Garden, FL 34787

Twelve Oaks
New Construction
Design
Orlando, FL

Sapphire Apartment Pool Restrooms
Renovation, Addition - 150 SF
Post-Bid
Winter Park, FL 32792

Leu Gardens Event Center Renovations
Renovation
Results
$850,000 est. value
Orlando, FL 32803

Last Updated 01/18/2022 01:27 PM
Project Title

Maifly Narcoossee Apartments

Physical Address View project details and contacts
City, State (County) Orlando, FL 32822   (Orange County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced April 2021, Construction Completion Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value $28,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To include Studio, 1, 2, 3-Bedroom Units

Details

6 Apartments/Condominiums, 4 Stories Above Grade, 300,000 SF New Construction 240 Unit(s), 1 Clubhouse/Social Club, 1 Story Above Grade, New Construction, 8.62 Acres.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents