Similar Projects
Sports Lighting for Baseball-Practice Football
Bidding
Lakeland, GA 31635

Field Lighting for High Schools
Post-Bid
Guyton, Springfield, GA 31312

Memorial Stadium Lighting
Post-Bid
Eastman, GA 31023

LED Sports Field Lighting Retrofits
Results
Less than $462,080 est. value
Lawrenceville, Lilburn, GA 30046

Lumasport 8 Football Stadium Lighting for Sandy Creek High School
Results
Tyrone, GA 30290

Athletic Facility Lighting
Post-Bid

As-Needed Sports Lighting Repairs and Maintenance
Term Contract
Results
Cumming, GA

Athletic Lighting - BCHS Track
Results
Cochran, GA 31014

Soccer Field Lighting
Results
Less than $99,697 est. value
Hamilton, GA 31811

Last Updated 03/26/2020 03:33 PM
Project Title

Athletic Field Lighting Design Build

Physical Address View project details and contacts
City, State (County) Dunwoody, GA 30338   (DeKalb County)
Category(s) Outdoor Lighting
Sub-Category(s) Athletic Lighting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Each proposal shall include information to allow the owner to develop the operating cost calculation for the system. The information shall include the following: • Lighting design of field to include number and location of poles and light fixtures. Spill light and glare control visors are required. • Electrical System Requirements • All fixtures, cross arms, lens, and related parts. • Remote operating capability • Wattage per fixture including ballast draw • Based on 400 hours of use per year for 25 years show the number of group lamp replacements required and when they are to occur, based on the lamp rating output hours for systems with automatic power adjustments, or 2100 hours for depreciating systems (70% of the rated lamp failure lamp life.) • Pole structures and cross arms shall be designed per IBC 2012 115 MPH wind Speed Importance Factor C • The average light levels on the field must be the appropriate foot candles based on a 30 ft. x 30 ft. grid or better. • Timeline and duration of installation.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents