Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

I-90, Dodson Road to Adams County Line- Paving
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value
WA

Broadway Corridor Improvements Phase 2
Infrastructure
Bidding
$2,100,000 est. value
Vancouver, WA 98687

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

I-405/SR 92, SR 520 Vic I-5 Vic and SR 9 Vic Paving and Ada Compliance
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Civil and Structural Construction Work Order
Infrastructure
Bidding
Less than $1,000,000 est. value
Seattle, WA

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

Reported 01/04/2022 12:00 AM
Project Title

Call for Artists Highway Two Easy Street Roundabout

Physical Address View project details and contacts
City, State (County) Wenatchee, WA   (Chelan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $175,000 to $200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To create a permanent art, landscape element and iconic, focal point of the new Highway 2/Easy Street Roundabout in Wenatchee.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents