Similar Projects
Reported | 02/20/2021 12:00 AM |
Project Title | Design Build-Step 1-Golden Gate Pkwy over Santa Barbara Canal Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | FL (Collier County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $5,200,000 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project is to remove the existing roadway bridge carrying Golden Gate Parkway (CR886) over Santa Barbara Canal and to remove and transport (for re-use) the two (2) existing steel pedestrian bridges carrying the sidewalks over the Canal with a new bridge that will carry both roadway traffic (2 lanes each direction) and (2) sidewalks (1 each direction) across the canal. The transverse section for the new bridge shall be designed to accommodate two (2), 12-foot travel lanes (in each direction), an approximate eight-foot wide outside shoulder and a 12-foot wide sidewalk on each side. A 1’-4” median concrete barrier shall be installed at the median to separate the two-directional traffic. Similarly, 36-inch high concrete traffic railings shall be installed to separate the sidewalks and the traffic lanes. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |