Similar Projects
Chester Creek Trail Phase 2
Design
$416,907 est. value
Media, PA 19063

Bituminous Seal Coat
Post-Bid
PA

Brandt School Road Betterment Marshall Township And Franklin Park Borough
Post-Bid
Harrisburg, PA

PA 104 to Market ST
Results
$500,000 to $999,999 est. value
PA

Mike Wood Boulevard - PA ST Keystone
Results
$1,000,000 to $5,000,000 est. value
PA

Scranton Ward, Scranton PA Stake Parking Lot Renovations
Renovation
Construction
$25,000 est. value
Clarks Summit, PA 18411

The Church Of Jesus Christ Of Latter-Day Saints, Parking Lot
Construction
$250,000 est. value
Berwick, PA 18603

Fall Brook Road T-612 Project
Post-Bid
Starlight, PA 18461

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Installation of the White Birch Road Extension at Humboldt Industrial Park
Construction
Hazleton, PA 18202

Bituminous Resurfacing Between Milepost 333.99 and Milepost 340.05 and Median Barrier Replacement Between Milepost 337.37 and Milepost 340.03
Post-Bid
PA

Horace Mann Street improvements
Results
Less than $775,000 est. value
PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Yearly Contract for Flat Saw Cutting of Paved Surfaces
Term Contract
Post-Bid
New Stanton, PA 15672

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Reported 02/04/2021 12:00 AM
Project Title

Reconstruction of Florida Avenue, and 9th Street, NW from T Street to Barry Place, NW

Physical Address View project details and contacts
City, State (County) Washington, DC 20009   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

onstruct approximately half mile of roadway, part reconstruction and part mill and overlay, with sidewalk widening; water and sewer facilities; and landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents