Similar Projects
Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

ATC 7-BMT Recruit Dormitory 7 Lackland
New Construction - 281,260 SF
Design
$100,000,000 to $250,000,000 est. value
San Antonio, TX 78275

Presolicitation for Horizontal Construction Idefinite Delivery Contracts (IDC) Under Multiple Award Task Order Contract (MATOC) In Support of The Us Army Corps of Engineers, Galveston District
New Construction
Design
$500,000,000 est. value

RM 12 at RM 3237 Intersection
Infrastructure
Bidding
$2,574,000 CJ est. value
Wimberley, TX 78676

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

Brush Square - Phase 1 Implementation
Infrastructure
Results
$2,200,000 est. value
Austin, TX

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Pollo Campero / Kyle
New Construction, Infrastructure - 2,675 SF
Construction
$2,109,500 CJ est. value
Kyle, TX 78640

Montage Mixed-Use / South Lamar
New Construction, Infrastructure - 310,661 SF
Pending Verification
$66,500,000 CJ est. value
Austin, TX 78704

Z'Tejas - Dry River District / Kyle
New Construction, Infrastructure - 4,725 SF
Pending Verification
$2,500,000 CJ est. value
Kyle, TX 78640

Gary Job Corp Lift Station (LS #46) Decommissioning and Water Main Extension - 575 - City of San Marcos
Renovation, Infrastructure
Conception
$7,800,000 CJ est. value
San Marcos, TX 78666

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

Last Updated 01/23/2023 03:05 PM
Project Title

Capitol Complex, Phase 2

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $225,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.spartnerships.com/newsletter/2022/tgi-11-18-2022/texas-government-insider-11-18-2022.html November 18, 2022 The second phase of the Texas Capitol Complex Project is underway with two new state office buildings totaling 525,000 square feet being added to the complex. The plan will extend the Capitol Complex pedestrian mall from 15th to 16th Street, completing the outdoor shopping area that stretches to Martin Luther King Jr. Boulevard. A new office structure will replace a childcare center and parking lot at the intersection of West 15th Street and Lavaca Street. A second structure will replace the Texas DPS district office at West 15th Street and Congress Avenue. The second phase of the project will extend the underground parking structure to follow the path of the pedestrian mall to add space for 2,550 cars. Extending underground parking may allow the demolition of above-ground parking in the area and use the land for future building projects. The second phase of the Capitol Complex Project should be completed in 2025. _________________________________________________________ As of June 22, 2022, this designer has been selected for this project. *The previous solicitation is listed below for reference TFC is requesting submittal of qualifications to provide prime professional architectural/ engineering (A/E) services for Project #20-028-8011, for two new state office buildings, associated parking structures, and extension of pedestrian mall (Capitol Mall) within the Capitol Complex in Austin, Texas. The project includes all aspects of the planning, development, architecture, engineering, design, procurement, demolition, renovation and construction of facilities and improvements for Phase Two of the Capitol Complex project. It is the intention of TFC to award a Contract for full prime professional architectural/engineering (A/E) services for the term of the project. Services undertaken pursuant to this RFQ will be required to commence within ten (10) calendar days of delivery of a Notice to Proceed. The Project associated with the services requested in this solicitation is anticipated to be sixty (60) months. STATEMENT OF WORK The A/E shall provide the architectural, engineering, scheduling, cost estimating and all other necessary services. A/E services shall be comprehensive in nature and will include programming, conceptual design, schematic design, design development, construction documents, solicitation assistance, construction administration, warranty management, and project close-out assistance. Specialized professional services will be required including, but not limited to: life cycle costing; utility infrastructure design; interior design; acoustics; lighting; food service; wayfinding signage and graphics; and landscape design. The construction of the project will be implemented using a Construction Manager at Risk (CMR) delivery process. The construction of the project will be divided into different stages, each with different dates for implementation and completion under separate Guaranteed Maximum Price (GMP) contract amendments or separate contracts, which require the A/E's issuance of multiple design packages. The number of design packages will be determined by TFC in cooperation with the A/E and CMR as reasonably necessary to execute the project in a logical and efficient manner. The project will require close coordination with the City of Austin, Travis County, and other governmental jurisdictions to secure agreements and permits. The project will also require multiple presentations to stakeholders and interested parties, as well as, ongoing communication to the general public. A/E services shall be offered with the understanding of full compliance with non-discrimination requirements of the State of Texas by the A/E. Deadline for Submission of Questions 7/27/2021 Deadline for Submission of Qualifications and HSP 8/03/2021 Tuesday @ 3:00 PM Deadline for Submission of Questions/Clarifications 9/09/2021 Deadline for Submission of Preliminary Conceptual Design 10/08/2021 Friday @ 3:00 PM Award by Commission 11/18/2021 Execute Contract 12/15/2021 The method of Contractor Selection has not been Determined at this time.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents