Similar Projects
CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

Construct Soldier Pile Retaining Wall, Repair RSP and HMA paving
Infrastructure
Bidding
$16,000,000 est. value
CA

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Bidding
$22,300,000 est. value
CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Bidding
$23,400,000 est. value
CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Heber Avenue Improvements
Infrastructure
Bidding
$953,375 est. value
Heber, CA 92249

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Last Updated 10/06/2021 12:21 PM
Project Title

Tamarack Sno-Park Repaving

Physical Address View project details and contacts
City, State (County) Shaver Lake, CA 93664   (Fresno County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to repave the Tamarack Ridge Trailhead. All work shall be in accordance with the contract requirements and within the contract time of 50 days. Contractor shall, without additional expense to the government, be responsible for obtaining any necessary licenses, permits, which comply with any federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. PROJECT DESCRIPTION: Tamarack Sno-Park needs repaving. Project will consist of pulverizing the existing asphalt surface to a depth of 3” and placing a 4” overlay of asphalt, striping, replacement of entrance sign and bulletin boards. Painting of two toilet buildings which includes the inside, outside and the roof.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents