Similar Projects
Winter Springs Townhomes
New Construction
Conception
Winter Springs, FL 32708

Ellis at Oviedo
New Construction - 24,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Oviedo, FL 32765

Legacy Pointe - Phase 1
New Construction
Design
$75,000,000 est. value
Oviedo, FL 32765

Dwell at Oviedo - Phases 1A and 1B
New Construction
Design
Oviedo, FL

Riverside Park Repairs
Results
Less than $265,000 est. value
Oviedo, FL 32765

County-Owned Property Redevelopment
Results
Altamonte Springs, FL 32701

Warley Park Apartments
New Construction - 5,895 SF
Construction
$10,000,000 est. value
Sanford, FL 32771

Warley Park Apartments
New Construction - 5,895 SF
Construction
$10,000,000 est. value
Sanford, FL 32771

Casselberry Townhomes
New Construction
Conception
Casselberry, FL

The Preserve of Sanford
New Construction
Design
Sanford, FL 32771

The Allure on Parkway
New Construction - 258,745 SF
Construction
$47,600,000 est. value
Sanford, FL 32771

Legacy 240 Apartments
New Construction - 34,026 SF
Design
Oviedo, FL 32765

Reserve at Lake Wildmere - Phase 2
New Construction - 72,200 SF
Construction
Longwood, FL 32750

Lakeside Views Townhomes at Lake Irene
New Construction
Design
Longwood, FL 32750

Integra Crossings Garden-Style Apartments
New Construction - 462,482 SF
Construction
Sanford, FL 32771

Last Updated 06/08/2020 02:31 PM
Project Title

Dwell at Lake Mary

Physical Address View project details and contacts
City, State (County) Lake Mary, FL 32746   (Seminole County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals, Construction Start Expected first quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use. Parcel One: Four three-story buildings and two four-story buildings, clubhouse, pool, dog park, walking trail, stormwater pond, surface parking, single-story garages along railroad track. Parcel Two: Two three-story mixed-use buildings. Ground level to include 19,000SF of commercial space. Second and third levels for 42 apartments. Complex to include total of 272 one, two and three-bedroom units. Total sq ft for project not available at this time.

Details

2 Apartments/Condominiums, 4 Stories Above Grade, New Construction, 6 Apartments/Condominiums, 3 Stories Above Grade, New Construction, 272 Unit(s), Clubhouse/Social Club, New Construction, 2.50 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Loading Dock Equipment, Office Equipment, Residential Equipment, Residential Appliances, Residential Ceiling Fans, Religious Equipment, Baptisteries.
Division 13 - Special Construction, Swimming Pools, On-Grade Swimming Pools, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents