Similar Projects
SS0408 - Flexible Pavement Structure Repair
Infrastructure
Bidding
$692,319 est. value
TX

IH0030 - Flexible Pavement Structure Repair
Infrastructure
Bidding
$525,035 est. value
TX

Vineyard Park Paving Improvements
Post-Bid
Sunnyvale, TX 75182

Paving and Utility Improvements for Bear Creek Ranch, Phase 3
Post-Bid
Dallas, TX

Southern Region Disaster Recovery Support BPA
Results

Woodland Park Trail Project and Improvements
Results
$105,000 est. value
Balch Springs, TX 75180

IH0035E - Flexible Pavement Structure Repair
Infrastructure
Bidding
$1,511,379 est. value
TX

Quail Glenn Alley Reconstruction
Post-Bid
Rowlett, TX 75088

2019 Concrete Pavement Repair and Reconstruction Project
Results
$600,000 to $675,000 est. value
DeSoto, TX 75115

FD - Gr, Str and Base Repair
Infrastructure
Bidding
$4,490,760 est. value
TX

Alley Reconstruction Group 17-7003
Post-Bid
Dallas, TX 75201

Major Capital Improvement Program No. 31405 Sunrise Road From Beltline Road to Pleasant Run Road
Results
$5,579,724 est. value
Lancaster, TX 75134

Cnst 0 to 2 Ln Frtg (Ult 6) and Turn Lanes
Infrastructure
Bidding
$102,494,136 est. value
TX

Alley Reconstruction - Southridge Drive/Skyline Drive Miramar Drive/Chiesa Road & Alissa Drive
Post-Bid
$942,000 est. value
Rowlett, TX 75088

Campbell Road Improvements from Collins to US 75
Results
$2,000,000 est. value
Richardson, TX 75080

Last Updated 06/29/2021 11:37 AM
Project Title

Montfort Drive Paving and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Dallas, TX 75295   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,470,718
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Street reconstruction of approximately 1,157 ft between Interstate Highway 635 frontage road (LBJ) and Alpha Road to reduce street from a six-lane divided roadway to a four-lane divided roadway with sidewalks and buffered bike lanes in each direction. The project will include replacement of storm drainage, water lines and wastewater mains; installation of new traffic signal with cameras, speed tables, pavement marking, street and pedestrian lightning; and integral colored concrete crosswalks.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents