Similar Projects
Clintonville - Lewisburg
Infrastructure
Design
$1,700,000 CJ est. value
Crawley, WV 24931

Clintonville - Lewisburg
Infrastructure
Design
$1,700,000 CJ est. value
Crawley, WV 24931

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Replacing Existing Storm Drainpipes and Drop Inlets
Infrastructure
Bidding
$8,000,000 CJ est. value
Ronceverte, WV 24970

Paving Project 2
Infrastructure
Post-Bid
Ronceverte, WV

Blue Sulphur Pavilion Roofing
Renovation
Post-Bid
Lewisburg, WV

Construction of and Repairs to the Meadow River Rail Trail
Infrastructure
Results
Lewisburg, WV

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

Lewisburg L&R Rail Trail
Infrastructure
Design
$452,250 CJ est. value
Rupert, WV 25984

Resurfacing - US 60 S Lafayette
Infrastructure
Bidding
$403,747 CJ est. value
Richland, WV 24901

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Distribution System Upgrades - Contract 6
Infrastructure
Results
Lewisburg, WV

Midland Trail Rd
Infrastructure
Design
$758,000 CJ est. value
Richland, WV 24901

Rupert Sidewalks 2014
Infrastructure
Post-Bid
$700,000 CJ est. value
Rupert, WV 25984

Raw Water Intake and Raw Water Line - Contract 8A
Infrastructure
Results
Lewisburg, WV

Last Updated 03/17/2023 12:31 AM
Project Title

GAOA Lake Sherwood Phase 2

Physical Address View project details and contacts
City, State (County) White Sulphur Springs, WV 24986   (Greenbrier County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The USDA Forest Service (FS), East Zone, has an anticipated requirement to provide materials, labor, equipment, and expertise to complete the removal and replacement of existing toilet and shower buildings with engineered pre-cast concrete buildings. Items of work include but are not limited to: Removal and disposal of designated trees Structural demolition/disposal, including asbestos wall board removal and utility disconnection Performing excavation, soil compaction, and other site preparation activities Providing, placing, and compacting aggregate for base and finish grade material Furnishing and installing new concrete shower and toilet buildings, including reconnection of existing utilities to the new facilities Forming, pouring, and finishing ADA-compliant concrete walkways Removal and replacement of compromised lift station basin including removing and resetting of existing pumps and rails in the new unit Final grading of sites; seeding and mulching; and other associated activities. This project is located at Lake Sherwood Campground, within the Lake Sherwood Recreation Area in the Monongahela National Forest. The project site is approximately 12 miles Northeast of Neola, WV. In accordance with Section L, Clause 452.237-71, Pg. 42 of RFP 12445523R0005, an optional Pre-Bid Site visit is scheduled for 15 Feb 2023 @ 11:00 A.M. ET. Location: Lake Sherwood Gatehouse; POC: Kendre Dipietro, COR, kendre.dipietro@usda.gov This procurement will be solicited using North American Industry Classification System (NAICS) 236220--Commercial and Institutional Building Construction, with a small business size standard of $39.5M. Construction Magnitude is between $500,000 and $1,000,000. See attached RFP 12445523R0005 and supporting documents for further details. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents