Similar Projects
Emergency Communications Tower Construction
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Downers Grove, IL 60515

Alley Maintenance
Term Contract
Post-Bid
Bensenville, IL

Systemwide Roadway Appurtenance Repairs
Results
Downers Grove, IL

2021 Asphalt Paving and Patching Program
Alteration
Results
Lombard, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

2022 Abbeywood South Park Asphalt Pathway Replacement
Infrastructure
Post-Bid
Lisle, IL

Asphalt Path and Associated Park Improvements
Infrastructure
Results
Aurora, IL

Naper Commons Park Development
Infrastructure
Construction
$250,096 CJ est. value
Naperville, IL 60540

2022 Roads Program
Infrastructure
Post-Bid
Bloomingdale, IL

2022 Pavement Rehabilitation at WWSHS
Infrastructure
Results
Wheaton, IL 60189

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

2022 Site Improvements
Infrastructure
Results
Willowbrook, IL 60527

Engineering Services for 2022 City Wide Resurfacing Phase III
Infrastructure
Post-Bid
Aurora, IL

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

Last Updated 06/19/2023 03:04 AM
Project Title

Bridge Deck (Sn 016-2665) Overlay and Joint Repairs of I 55

Physical Address View project details and contacts
City, State (County) Willowbrook, IL 60527   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(2,404-Ft) The proposed improvement consists of bridge deck (SN 016-2665) overlay and joint repairs of I 55 (Stevenson Expressway) at US 12/20/45 (La- Grange Road) (overpass) in the Village of Hodgkins and the City of Countryside, Cook County. Region 1 District 1 Federal Project # NHPPJWYJ(737) County(s) Cook Key Route(s) FAI 55 Marked Route(s) I 55 Section(s) FAI 55 22 BJ State Job #(s) C-91-257-22 PPS #(s) 1-81062-0000 Section FAI 55 22 BJ 65 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 125 - Bridge Deck (Sn 016-2665) Overlay and Joint Repairs of I 55 DBE (21%) The Contractor shall complete the work within 65 working days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents