Similar Projects
Lime Slaker System
Post-Bid
Less than $750,000 est. value
Pompano Beach, FL 33064

Corrosion Inhibitor (Orthophosphate) For Water Treatment Plant Operations
Addition
Post-Bid
Deerfield Beach, FL

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

Water Treatment Plant Lime Feed System Refurbishment
Results
Less than $1,500,000 est. value
Pembroke Pines, FL 33024

Peele-Dixie WTP Surge Protection Upgrades
New Construction
Post-Bid
Davie, FL 33317

Interior Renovations/ADA Upgrades at Water Treatment Plant (WTP)
Renovation
Results
Less than $215,819 est. value
Pompano Beach, FL 33060

East Water Treatment Plant Improvement Phase II
Results
Less than $529,718 est. value
Deerfield Beach, FL 33441

WTP Lime Feed System Refurbishment, SCC Valve Insertion, Magnetic Flowmeter Insert
Results
$2,500,000 est. value
Hollywood, Pembroke, FL 33024

Lime Slaker Repair Services
New Construction
Results
Davie, Sunrise, FL 33351

Lime Laker Installation and Repair Services
Renovation
Results
Hollywood, FL 33024

East Water Treatment Plant Chemical Storage Facilities - Phase II
New Construction
Results
$3,604,000 est. value
Plantation, FL 33317

Water Treatment Plant (WTP) Hurricane Hardening
New Construction
Results
$3,491,910 est. value
Pompano Beach, FL 33060

FiveAsh Water Treatment Plant Filters Rehabilitation - Phase 2
Renovation
Results
$2,900,000 est. value
Fort Lauderdale, FL 33309

Replacement of Sluice Gates at Fiveash Water Treatment Plant
Renovation
Results
Oakland Park, FL 33309

Fiveash Water Treatment Plant Valve Replacements
Renovation
Results
$1,500,000 est. value
Fort Lauderdale, FL 33309

Reported 02/17/2022 12:00 AM
Project Title

Water Treatment Plant Operations-Everglades Holiday Park

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33332   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope includes, but is not limited to, the furnishing of all labor, materials, equipment, services and incidentals for the Water Treatment Plant Operations at Everglades Holiday Park for the Parks and Recreation Division.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents