Similar Projects
Potato Cut Project - Shasta County
Infrastructure
Conception
$1,000,000 est. value
Montgomery Creek, CA 96065

Anderson Park Concrete Repair - PW1718 - City of Carson
Infrastructure
Conception
$1,422,000 est. value
Anderson, CA 96007

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Shasta County New Jail or Expansion
Addition, Demolition, New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Redding, CA 96001

RFP - Development at the Redding Regional Airport
Infrastructure
Bidding
$1,000,000 CJ est. value
Redding, CA 96002

RFP - Development at the Redding Regional Airport
Infrastructure
Bidding
$1,000,000 CJ est. value
Redding, CA 96002

Metal Building PEC / Redding
New Construction, Infrastructure - 10,600 SF
Sub-Bidding
$750,000 CJ est. value
Redding, CA 96002

CHP Cottonwood Commercial Vehicle Enforcement Facility (CVEF) and Cottonwood Platform Scales- Parking Lot Sweeping Services.
Term Contract
Post-Bid
Cottonwood, CA 96022

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

HMA overlay, replace AC surfacing and shoulder backing
Infrastructure
Results
$1,570,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Construction of the Boulder Creek Gym Addition
Addition, Demolition, Infrastructure
Construction
$2,930,000 CJ est. value
Redding, CA 96003

La Quinta Inn / Redding
New Construction, Infrastructure
Pending Verification
$5,334,713 CJ est. value
Redding, CA 96003

Bethel Church of Redding
Addition, Renovation, Infrastructure - 36,383 SF
Pending Verification
$14,300,000 CJ est. value
Redding, CA 96003

Zogg Fire - Guardrail Repair Platina Road (1C01A) Various Locations
Infrastructure
Bidding
$257,543 CJ est. value
Igo, CA 96047

Last Updated 01/31/2023 09:56 AM
Project Title

West Central Landfill Site Improvements

Physical Address View project details and contacts
City, State (County) Igo, CA 96047   (Shasta County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,478,637 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*As of September 22, 2022, a contractor has been awarded. The work, in general, consists of expanding the Transfer Area with stormwater conveyance pipeline improvements, drop inlets, earth grading, earthwork, concrete site work, hot mix asphalt paving, pavement stripping, extending underground utilities and furnishing a Metal Building System. Improvements to the Shop Area include pavement removal, earthwork, drainage inlet, concrete sitework, aggregate base, and hot mix asphalt. Improvements to the Gas Collection System include the extend the gas collection header below grade, relocate condensate pump, and reconfigure gas collection laterals above grade. Pre-Qualification for Bidders: Not Required Project Duration: 60 Work Days Liquidated Damages: $4,200.00 Per Work Day Bid Bond Percentage: 10%

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents