Similar Projects
Calesa - Master Plan
New Construction
Conception
Ocala, FL

Redlands Christian Migrant Head Start Centers
Conception

K-12 International Boarding School
New Construction
Design
Panama City, FL 32409

Replace Jensen Beach Elementary School
New Construction
Design
Jensen Beach, FL 34957

Boulevard Heights Elementary School - Smart Program Renovations
Renovation
Bidding
$2,556,096 est. value
Hollywood, FL 33024

Building Official Services for Franklin Park Elementary School Rebuild Construction
New Construction
Bidding
Fort Myers, FL 33916

Deerfield Beach Elementary School - Smart Program Renovations
Sub-Bidding
$3,777,000 est. value
Deerfield Beach, FL 33441

Somerset Academy Bethany - Interior Improvements
Renovation - 15,480 SF
Sub-Bidding
Saint Lucie West, FL 34986

Englewood Elementary School Building 6 Replacement
New Construction - 11,277 SF
Post-Bid
$5,500,000 est. value
FL 34223

Maplewood Elementary School - Smart Program Renovations
Renovation
Post-Bid
Less than $1,759,996 est. value
Coral Springs, FL 33071

Construction Management at Risk Services (CMR) to Replace Martin County School District's (MCSD) Jensen Beach Elementary School and Palm City Elementary School
Results
Jensen Beach, Palm City, FL 34957

Chapel Trail Elementary School - Smart Program Renovations
Renovation
Results
Less than $1,086,852 est. value
Pembroke Pines, FL 33029

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Palmer Trinity School - Classroom Building
New Construction - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Palmetto Bay, FL

Lake Mary Elementary
Conception
$12,024,220 est. value
Lake Mary, FL 32746

Reported 04/29/2021 12:00 AM
Project Title

SDOC Westside K8 Network Core Relocation

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34747   (Osceola County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: Mechanical and Electrical build out of existing MDF space at Westside K-8 school to support Network core servers. To include redundant Dx units, mechanical reconfiguration, electrical support and a backup generator.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents