Similar Projects
Digital Enterprise Conduit Deployment Segment 1 Phase 1
Alteration
Bidding
West Des Moines, IA 50266

Radio Frequency Identification System- RFID
Alteration
Post-Bid
Less than $75,000 est. value
Pella, IA

Digital Enterprise Last Mile Conduit Deployment Segment 1 Phase 1
Alteration
Bidding
Des Moines, IA

Digital Enterprise Conduit Deployment 2021 Multi-Family and Non-Residential Drop Installation Phase 2
Alteration
Bidding
Des Moines, IA

Burlington Community Schools - Camera Upgrades
Alteration
Post-Bid
Burlington, IA 52601

Digital Enterprise Conduit Deployment Segment 4 Phase 1
Alteration
Results
West Des Moines, IA

Information Technology Services
Term Contract
Post-Bid
Waterloo, IA 50703

ImOn Ice Arena Audio System Replacement
Alteration
Results
$325,000 est. value
Cedar Rapids, IA 52404

Fiber Conduit Inter-Connect (Pink Route - Phase 1)
Alteration
Results
West Des Moines, IA

Materials for Network Infrastructure Upgrade
Alteration
Post-Bid
Davenport, IA

Emergency Management Audio/Video Upgrades
Alteration
Bidding
Polk City, IA

Digital Enterprise Conduit Deployment Segment 3 Phase 3
Alteration
Results
West Des Moines, IA

Professional Services Network Infrastructure
Alteration
Results
Davenport, IA

Last Updated 08/02/2021 12:09 PM
Project Title

Fiber Conduit Inter-Connect (Orange Route - Phase 2)

Physical Address View project details and contacts
City, State (County) West Des Moines, IA   (Polk County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Fiber Conduit Inter-connect project (Orange Route – Phase 2) includes installation of one 7-way multi-duct conduit within a 4-inch HDPE sleeve, one 7-way multi-duct conduit and two 1-inch HDPE conduits in a duct bank configuration, installation of one 7-way multi-duct conduit within a 4-inch HDPE sleeve in a stand-alone configuration, installation of 1.5-inch HDPE conduit, installation of structures and surface restoration along the South Grand Prairie Parkway, Raccoon River Drive and Booneville Road corridors in the City of West Des Moines, Iowa. Improvements include installing approximately 23,027 lineal feet of 4-inch HDPE conduit, installing 23,412 lineal feet of 7-way multi-duct conduit within the 4-inch sleeve, installing 12,366 lineal feet of 7-way multi-duct conduit in a duct bank configuration and 26,554 lineal feet of 1-inch HDPE conduit in a duct bank configuration, installation of 11,648 lineal feet of 1.5-inch HDPE conduit, installation of handholes and vaults, installation of test stations, racking systems in the structures, clearing and grubbing, erosion control, traffic control and other associated improvements required for a complete and functional conduit network for the future installation of fiber optic cables.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents