Project Title | Wastewater Treatment Plant Rehabilitation and Lift Station Conversion |
Physical Address | View project details and contacts |
City, State (County) | Katy, TX 77449 (Fort Bend County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $1,365,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall review the entirety of the contract documents for the full details of the work involved. The work generally includes but is not limited to: all necessary permits, site preparation, dewatering and groundwater control for open cut construction, removal and disposal of accumulated solids from the treatment units, wet well and dry-pit, by-pass pumping, and selective demolition and modifications in the influent lift station and wastewater treatment plant as shown in the construction drawings; conversion of the influent lift station from a dry-pit configuration to a full wet/well submersible pump configuration including installation of new submersible pumps, piping, valves and associated fittings, pressure blasting and coating of existing and proposed wet well, new access hatches with safety grate, and structural modifications as shown in the construction drawings; modifications to the existing control and storage building as shown in the construction drawings and including the construction of a new concrete platform to house proposed and existing electrical equipment; improvements to the wastewater treatment plant including replacement of air drop/diffuser assemblies and handrails, and sealing of concrete joints at treatment basins as indicated by the contract documents; electrical improvements as shown in the construction drawings and including relocation and selective demolition of existing equipment, installation of new motor control center, wire gutter and main breaker panel in the control and storage building, installation of pump control panel, auto-sensory controls, floats and terminal boxes for the influent lift station; together with all related subsidiary and incidental components as shown in the contract documents. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |