Similar Projects
Aventura Corporate Center Mixed Use Development
New Construction
Conception
Aventura, FL 33180

Alger Commons
New Construction - 126,000 SF
Conception
Florida City, Homestead, FL 33034

Riverside Wharf
New Construction - 400,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

MCID-2
New Construction, Renovation, Build-Out - 1,141,800 SF
Design
$10,000,000 est. value
Miami, FL

The Chicken Guy Restaurant - Dadeland
Renovation - 3,500 SF
Post-Bid
Kendall, FL 33156

RaceTrac #2576
New Construction - 5,830 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Publix #1770
New Construction, Demolition - 47,000 SF
Construction
$10,000,000 est. value
Coral Gables, FL

Tropical Chevrolet Expansion
New Construction, Renovation, Addition - 1,056 SF
Construction
Less than $1,500,000 est. value
Miami Shores, FL 33138

Target
New Construction - 77,471 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33010

Murphy Express #8975
New Construction
Conception
Miami Gardens, FL 33054

Jungle Island Hotel
New Construction, Build-Out, Demolition - 346,000 SF
Design
Less than $300,000,000 est. value
Miami, FL

BurgerFi Restaurant
Renovation - 1,746 SF
Post-Bid
Miami Lakes, FL 33014

Biscayne Bay Brewing Company
Build-Out - 6,893 SF
Construction
$531,204 est. value
Miami, FL

Magic City Parcel 11
New Construction
Conception
Miami, FL 33137

NoMad Residence
New Construction
Design
$10,000,000 CJ est. value
Miami, FL

Reported 06/08/2022 09:13 AM
Project Title

Orion Sixto

Physical Address View project details and contacts
City, State (County) Doral, FL 33166   (Miami-Dade County)
Category(s) Commercial
Sub-Category(s) Car Wash, Food/Beverage Service, Gas Station, Supermarket/Convenience Store
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish the existing building and construct a gas station with a 2,355 square foot convenience store. The interior buildout will include a food preparation area equipped with a kitchen hood exhaust system. A car wash will be included as part of the convenience store structure. A seating area is also being proposed on the North side of the building. The gas station portion will include six (6) dispensers and will be covered by a 3,337 square foot metal canopy structure.

Details

,, 5,692 SF - Car Wash, Gas Station, Approximately 3,337 SF New Construction, Supermarket/Convenience Store, Approximately 2,355 SF New Construction, 6 Fuel Pump(s), Food/Beverage Service.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents