Similar Projects
Last Updated | 06/16/2023 12:04 PM |
Project Title | FDR, Mill, paving |
Physical Address | View project details and contacts |
City, State (County) | Olivia, MN 56277 (Renville County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,105,190 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Stabilized Full Depth Reclamation, Mill Bituminous Pavement, Bituminous Paving, and Aggregate Shoulde SAP 065-602-024 1,454 SY Full Depth Reclamation 68,300 SY Stabilized Full Depth Reclamation 2,527 TON Shoulder Base Aggregate Class 1 58,851 SY Mill Bituminous Surface 3.00" 11,117 TON Type SP 12.5 Wearing Course Mixture 2C 11,673 TON Type SP 12.5 Non Wearing Course Mixture 2B 46,938 LF 6" Solid Line Paint 4,689 LF 4" Solid Line Paint 1,885 LF 4" Broken Line Paint SAP 065-606-015 1,904 SY Full Depth Reclamation 64,994 SY Stabilized Full Depth Reclamation 17,192 TON Aggregate Base Class 5 8,031 TON Shoulder Base Aggregate Class 1 56,112 SY Mill Bituminous Surface 2.50" 12,406 TON Type SP 12.5 Wearing Course Mixture 2C 8,780 TON Type SP 12.5 Wearing Course Mixture 2B 17,079 TON Type SP 12.5 Non Wearing Course Mixture 2B 66,450 LF 6" Solid Line Paint 26,312 LF 4" Solid Line Paint 2,045 LF 4" Broken Line Paint Each bid shall be accompanied by a bidder's bond naming the County of Renville as obligee, or certified check payable to the Auditor/Treasurer of Renville County equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the County in the event that the bidder fails to enter into a contract. The County Board of Commissioners reserves the right to retain the deposits of the three lowest bidders for a period not to exceed sixty (60) days after the date and time set for the opening of bids. No bids will be withdrawn for a period of sixty (60) days after the date and time set for opening bids. The County Board of Commissioners reserves the right to reject any or all bids, waive technicalities and to award the bid in the best interest of the County of Renville. Award is scheduled for June 13, 2023. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |