Similar Projects
John Glenn Middle School Tennis Court Lighting Installation
Infrastructure
Sub-Bidding
$125,000 CJ est. value
Bedford, MA 01730

Green Line Overhead Catenary System SGR
Alteration
Post-Bid
$7,729,085 est. value
Burlington, MA

Countryside Village Unit Bathroom and Door Modernization - Filed Sub-Bid
Alteration
Post-Bid
$1,021,665 est. value
Lexington, MA 02420

Reuben Hoar Public Library Photovoltaic System
Alteration
Results
$122,640 est. value
Littleton, MA 01460

City Hall Standby Generator
Alteration
Results
$340,000 est. value
Melrose, MA 02176

Shannon Beach Restroom Facilities - Sub-Bids
Alteration
Post-Bid
$2,050,694 est. value
Winchester, MA 01890

Lexington Temporary Police Station Renovation - Filed Sub Bids
Alteration
Results
$340,000 est. value
Lexington, MA 02420

Display Monitoring - Ashland Campus
Alteration
Post-Bid
$17,000 est. value
Ashland, MA 01721

Police Training Room and Office Renovations - Sub-Bids
Alteration
Results
$840,000 est. value
Reading, MA 01867

Stoneham High School Solar Storage System
Alteration
Post-Bid
Stoneham, MA 02180

Installation of Complete Electric Vehicle Charging System
Alteration
Results
$140,500 est. value
Reading, MA

South Campus Electrical Infrastructure Phase 3
Alteration
Post-Bid
$388,877 est. value
Lowell, MA 01854

Police Headquarters HVAC System Improvements - Sub Bids
Alteration
Results
$800,000 est. value
Newton, MA 02465

Pump Stations SCADA and Electrical Upgrades - Phase 5
Alteration
Post-Bid
$210,500 est. value
Framingham, MA

667-2 Selective Kitchen Modernization - Phase 2 - Filed Sub Bids
Alteration
Results
$592,983 est. value
Stoneham, MA

Last Updated 06/22/2023 01:33 PM
Project Title

Hale Street Electrical

Physical Address View project details and contacts
City, State (County) Lowell, MA 01851   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $17,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of aluminum feeder electrical feeder section and carpentry work to cut and repair wall to allow electrical work. Carpentry and electrical An electrician will be required to lock out, tag out electrical services while carpentry is being performed. A carpenter will then cut, remove and preserve the drywall for reinstallation below existing electrical panels in (12) units, approximately 42" high by 24" wide, to expose abandoned (aluminum) electrical wiring within the walls. Once exposed, the electrician is to remove the abandoned wiring in all (12) units. The electrician will also be required to plug up any "knock outs" missing from inside the panel as required by code. The carpenter will temporarily replace the cut dry wall until the wire inspector can inspect and sign off that the old wiring has been removed. Once the electrical inspector has approved the work, the wall is to be restored fully (tape, mud, sanded, primed, and painted corner to corner, edge to edge). Great care should be taken to control dust and to protect residents' belongings. QUESTION DUE DATE: May 18, 2023 @ 3:00 PM MBE/WBE PARTICIPATION GOALS - NO REQUIREMENTS

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents