Similar Projects
Challenger School
New Construction
Conception
Leander, TX 78641

Renovations at Pickle Elementary School
Renovation
Bidding
Less than $1,267,452 est. value
Austin, TX 78752

Improvements at Graham Elementary School
Renovation
Bidding
$550,000 est. value
Austin, TX 78753

Basis Austin Primary Crestview Campus Renovations
Renovation
Post-Bid
Austin, TX 73301

Brentwood ES Modernization
Renovation
Post-Bid
Less than $30,025,047 est. value
Austin, TX 73301

Construction of Middle School 7 and Elementary School 22
New Construction - 313,165 SF
Results
Less than $82,400,000 est. value
Pflugerville, TX

Construction Manager at Risk to Complete PHS Renovations and Additions
Renovation, Addition
Results
$15,367,105 est. value
Pflugerville, TX 78660

Casis Elementary School
Renovation, Demolition - 94,718 SF
Construction
Austin, TX 78703

Leander Elementary School 28 Bid Package 2
New Construction - 112,200 SF
Construction
Leander, TX 78641

Critical Repairs at Patton Elementary School
Renovation
Bidding
$934,384 est. value
Austin, TX 78749

Easton Phase 1
New Construction - 80,000 SF
Post-Bid
$15,000,000 est. value
Austin, TX 78744

New Elementary and Middle School Project
New Construction - 78,000 SF
Results
$16,500,000 est. value
Austin, TX 78753

Rosedale School Bp4 - Modernization
- 75,000 SF
Construction
Austin, TX 78757

Rogers-O`Brien - Rosedale School
New Construction - 75,000 SF
Post-Bid
Austin, TX 78757

Additions at Delco and Dessau Elementary Schools
Addition - 19,400 SF
Results
$4,900,000 est. value
Austin, TX 78754

Last Updated 08/25/2021 01:35 PM
Project Title

Renovations at Mills Elementary School

Physical Address View project details and contacts
City, State (County) Austin, TX 78749   (Travis County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $539,929
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the renovation of various areas including, but not limited to, rooftop unit replacement over the kitchen, dining, and gymnasium area. Also included in the Project is upgrades to the kitchen plumbing at the dish wash area and staff restroom. The side will be upgraded to help properly drain the back side of the campus, and the existing wood stairs will be replaced with new concrete stairs with guardrails and handrails.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents