Similar Projects
Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

New Consolidated High School - Mass Grading
Renovation, Infrastructure
Post-Bid
Hopkinsville, KY 42240

Hopkinsville-Christian County Academy
New Construction, Infrastructure
Post-Bid
$39,000,000 CJ est. value
Hopkinsville, KY 42240

Asphalt Resurfacing - Christian County (Us 41 and Ky 2455)
Infrastructure
Results
KY

Asphalt Resurfacing- Newstead Road (Ky 164) (Mp 0.000)
Infrastructure
Results
KY

New Hammond Heights Community Renovation
Renovation, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Fort Campbell, KY 42223

Apex 1
New Construction, Infrastructure - 450,000 SF
Pending Verification
$310,000,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of Edward T. Breathitt Pennyrile Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Hopkinsville, KY 42240

Rest Area Sewer System Repair Christian County
Infrastructure
Post-Bid
$1,700,000 CJ est. value
Hopkinsville, KY 42240

Canton Pike (KY 272) - Pavement
Infrastructure
Results
KY

Elevate Windows and Doors Build-Out
New Construction, Infrastructure - 100,000 SF
Conception
$16,000,000 CJ est. value
Hopkinsville, KY 42240

Asphalt Resurfacing
Infrastructure
Post-Bid
$1,205,590 CJ est. value
Hopkinsville, KY 42240

Mike Foster Way COnnector Road
Infrastructure
Results
$175,000 to $225,000 est. value
Hopkinsville, KY

RFP D/B - DoDEA Lucas Elementary School Playground Repair
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Fort Campbell, KY 42223

Last Updated 02/17/2023 04:10 AM
Project Title

Concrete Paving - Site Improvements

Physical Address View project details and contacts
City, State (County) Hopkinsville, KY 42240   (Christian County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $132,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

RFB-785-2300000340 The Scope of this Project shall include all labor, materials, tools, equipment, and services required to construct and install the complete and operational systems described herein and on the Drawings. The Project includes clearing, demolition, and disposal of all debris from the removal of the indicated concrete & gravel areas. All earthwork and grading necessary to construct the new concrete paving and drainage improvements according to the project plans and specifications. Subgrade preparation, rock base/surface, concrete reinforcement installation, and concrete placement for the new pavement according to the project plan and specifications is to be included. Contractor is responsible for all general and special conditions associated with this project as described in the project plans and specifications. All questions need to be emailed to Justin Lamb, jlamb@associatedengineers.com by August 8, 2022, by noon. Estimated Length of Project: 45 (Substantial Completion) + 30 (Final Completion) p.No- 21-0243B

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents