Similar Projects
The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

Hope Mill Redevelopment
New Construction, Renovation - 116,030 SF
Design
$56,000,000 est. value
Scituate, RI 02815

Hope Mill Redevelopment
New Construction, Renovation - 116,030 SF
Design
$56,000,000 est. value
Scituate, RI 02815

Bernon Mill
New Construction
Post-Bid
$22,000,000 to $25,000,000 est. value
Woonsocket, RI 02895

CSO Phase III A-9 GSI Projects
Infrastructure
Post-Bid
Central Falls, RI 02863

Site Improvements at Goldsmith Manor
Infrastructure
Results
East Providence, RI 02914

Completing Elevator Modernization at Parkview Manor
Renovation
Results
Woonsocket, RI 02895

Douglas Pike Development
New Construction - 13,000 SF
Construction
$400,000 est. value
Smithfield, RI 02896

I-95 Redevelopment Site Parcel 6
New Construction - 67,000 SF
Construction
$15,000,000 est. value
Providence, RI

New Pond Park - City Of Cumberland
Infrastructure
Pending Verification
$40,000,000 CJ est. value
Cumberland, RI 02864

The Preserve at Pippin Orchard
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cranston, RI 02921

Central Street Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Central Falls, RI 02863

Parcel 9
New Construction - 155,000 SF
Design
$48,000,000 est. value
Providence, RI

Statewide Resurfacing
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Cranston, RI 02910

Last Updated 06/26/2023 01:06 PM
Project Title

Champlin Hills Apartments

Physical Address View project details and contacts
City, State (County) Cranston, RI 02921   (Providence County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $34,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project has been submitted into the City of Cranston and is under review. No other applications or building permits have been submitted. An architect and general contractor have been selected. A firm construction timeline has not been set, however construction is not expected to begin prior to fall 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents