Similar Projects
Design Build Services for Lower Westchester Bridge Bundle
Post-Bid
$100,000,000 est. value
NY

Emergency Repair of Hickory Grove Bridge
Post-Bid
Mamaroneck, NY 10543

Bridge Rehabilitation of Guard Rd and Broad Brook Rd Over I-684
Results
Less than $7,300,000 est. value
Bedford, White Plains, NY 10600

Rehabilitation of 6 Bridges at Various Locations over the Sprain Brook Parkway (987F) and the Cross-County Parkway (907K)
Results
Less than $10,600,000 est. value
Greenburgh, Yonkers, NY 10603

Hillside Avenue Bridge Replacement Over Mamaroneck River PIN 8761.65
Post-Bid
Mamaroneck, NY 10543

Bridge Replacement of Ravensdale Over Saw Mill River Parkway
Results
Less than $15,000,000 est. value
Hastings-on-Hudson, NY 10706

Rehabilitation of Various Bridges
Results
$3,500,000 to $4,000,000 est. value
NY

Replacement of Hungry Hollow Bridge at MP 24.62, Scotland Hill Road Bridge at MP 23.62 and College Road Bridge at MP 26.37 and Bridge Washing on I-95
Results

Replacement of Old Albany Post Road Bridge Over Canopus (Sprout) Brook (Bin 1050460, Pin 8761.67)
Results
$4,000,000 to $4,500,000 est. value
Cortlandt Manor, NY 10567

Replacement of the Hill Boulevard Bridge over Barger Brook Tributary and Replacement of the Veterans Road Culvert over the Hallocks Mill Brook
Results
Yorktown Heights, NY 10598

Rehabilitation of Mamaroneck Avenue Bridge Over Mamaroneck River (BIN 3347919)
Results
$5,500,000 to $6,000,000 est. value
Harrison, Mamaroneck, NY

Station Access Road over Pondfield Road Bridge Rehabilitation
Results
Bronxville, NY 10708

Rehabilitation of Babcock Place Bridge Over Metro North Railroad
Results
Yonkers, NY 10701

Reconstruction of Entrance Pedestrian Bridge at Enrico Fermi School
Results
Yonkers, NY 10701

Bridge Washing on I-95
Results

Last Updated 01/22/2021 05:51 AM
Project Title

Bridge Rehab: Four Bridges in City of Yonkers

Physical Address View project details and contacts
City, State (County) Bronxville, Elmsford, Greenburgh, Mount Pleasant, Scarsdale, Yonkers, NY 10583   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $27,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will rehabilitate or replace four bridges in Westchester county. The work will include replacing the bridge carrying the Saw Mill River Parkway over State Route 119 in the Town of Greenburgh in the Village of Elmsford and the bridge carrying DeWitt Avenue over the Sprain Brook Parkway in the City of Yonkers and Village of Bronxville. This project will also rehabilitate the bridge that carries Hospital Road over the Sprain Brook Parkway in the Town of Mount Pleasant and the bridge carrying Ardsley Road over the Sprain Brook Parkway in the Town of Greenburgh.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents