Similar Projects
West Reno, North Portland-Meridian - West bound on Reno Avenue from North Portland to North Meridian Avenue (Ward 3) - City of Oklahoma City
Infrastructure
Conception
$555,000 est. value
Oklahoma City, OK 73195

West Reno, North Portland-Meridian - West bound on Reno Avenue from North Portland to North Meridian Avenue (Ward 3) - City of Oklahoma City
Infrastructure
Conception
$555,000 est. value
Oklahoma City, OK 73195

Utilities - US 64
Infrastructure
Design
Less than $300,000 est. value
Alva, OK

Utilities - US 70
Alteration
Design
$1,464,764 est. value
Kingston, OK 73439

Replacing Water Line in the 300 and 400 Blocks of North Gunter Street
Infrastructure
Bidding
$400,000 est. value
Vinita, OK 74301

HDPE Water Main Extension/Water Service Line
Infrastructure
Bidding
$300,000 est. value
Terlton, OK 74081

AMI Electric and Water Meter Installation
Infrastructure
Post-Bid
Edmond, OK

AMI-AMR Water and Electric Meters
Infrastructure
Post-Bid
Lindsay, OK

Water Line Replacement
Results
McAlester, OK 74501

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

North Canadian Expansion - 12800 North Anderson Rd (Ward 7) - City of Oklahoma City
Alteration
Conception
$1,118,000 est. value
Jones, OK 73049

Utilities - SH 69A
Infrastructure
Design
$309,000 est. value
Miami, OK 74354

Stormwater Inlet Rehabilitation Project
Infrastructure
Bidding
$110,000 est. value
Norman, OK

Water Line Extensions 2021
Infrastructure
Post-Bid
Duncan, OK

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

Reported 07/05/2022 01:55 PM
Project Title

Utilities - SH 132

Physical Address View project details and contacts
City, State (County) State-Wide: OK
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Wakita, Oklahoma. Working plans call for site work for a water / sewer project. Sh-132: Box Replacement Over Unnamed Creek, 0.35 Miles North of Us-64 Jct (Ut for 04) As of July 01, 2022, the project is in Final Planning status. Anticipated letting month/year is July, 2022. Length : 0.100 Mi OKDOT - Utilities - SH 132 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents