Similar Projects
Medium Density Residential
New Construction
Conception
Salt Lake City, UT 84116

Bonnyview Apartment
New Construction - 298,975 SF
Conception
$10,000,000 CJ est. value
Murray, UT 84107

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

South Cairns Development
New Construction
Design
Sandy, UT 84070

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Bidding
$109,525,000 est. value
Salt Lake City, UT 84108

Atre Sugar House
New Construction - 378,866 SF
Bidding
$10,000,000 CJ est. value
Salt Lake City, UT 84106

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

Salt Lake Crossing
New Construction - 306,775 SF
Post-Bid
$12,000,000 to $13,000,000 est. value
Salt Lake City, UT

Upper West Apartments
New Construction - 315,535 SF
Construction
West Jordan, UT 84088

Block 67
New Construction - 430,000 SF
Construction
$5,454,500 est. value
Salt Lake City, UT 84111

Huddart Lofts
New Construction - 60,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Salt Lake City, UT

Urban 9th Mixed Use
New Construction - 8,900 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Salt Lake City, UT

The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

South Highland Mixed Use
New Construction - 166,481 SF
Design
$10,000,000 CJ est. value
Millcreek, UT

Slate Multi-Family Mixed Use
New Construction - 123,140 SF
Post-Bid
$5,094,463 est. value
Salt Lake City, UT 84101

Reported 07/14/2021 12:00 AM
Project Title

The Zephyr

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84101   (Salt Lake County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected August 2021
Bids Due View project details and contacts
Estimated Value $6,827,300
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, 8 Stories Above Grade, 99,892 SF New Construction 140 Parking Spaces, 0.73 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents