Similar Projects
North Central High School and Athletic Facilities
Renovation, Addition
Design
Less than $162,537,000 est. value
Indianapolis, IN 46240

New Northview Middle School
New Construction
Design
Less than $72,187,000 est. value
Indianapolis, IN 46200

Carmel HS Performing Arts Center, Main Office, Auditorium and Planetarium
Renovation, Addition
Bidding
Carmel, IN 46032

IPS Safety and Modernization / Interior Door Film Application CMc Proposals
Sub-Bidding
Indianapolis, IN 46208

North Central High School Central Plant and Auditorium
Renovation
Sub-Bidding
Indianapolis, IN 46240

IPS Safety And Modernization / Interior Hardening for High Schools
Post-Bid
Indianapolis, IN

Construction Manager (CMc at Risk) RFP for H Donald Inskeep Transportation Center
Post-Bid
Lawrence, IN 46236

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Lawrence North High School
Renovation, Addition
Construction
$63,000,000 est. value
Indianapolis, IN 46256

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition
Design
Less than $19,398,000 est. value
Indianapolis, IN 46200

Westfield Washington Schools-Early Childhood Center and Administration Building-Bid Package 1
- 57,698 SF
Post-Bid
Westfield, IN 46074

Noblesville High School Multi-Purpose Stadium Phase 2
Results
Noblesville, IN 46060

Centralized Service Center (Former Northview MS)
Renovation
Design
Less than $18,800,000 est. value
Indianapolis, IN 46200

RFP- Construction Manager As Constructor
New Construction, Renovation, Addition, Demolition - 1,474,984 SF
Post-Bid
Less than $334,159,000 est. value
Indianapolis, IN 46240

Reported 02/10/2021 12:00 AM
Project Title

Carmel Clay Schools - 2021 Renovation - Phase 2

Physical Address View project details and contacts
City, State (County) Carmel, Indianapolis, IN 46033 (Hamilton, Marion Counties)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Categories 01: Carmel H.S. Loading Dock Storage 02: Carmel H.S. HVAC Equipment Replacement & Carmel Life and Learning Center HVAC Equipment Replacement 03: Carmel H.S. Parking Lot Addition 04: Carmel Middle School Tennis Complex Repairs 05: Clay M.S. Track Resurfacing and Carmel M.S. Track Resurfacing

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents