Similar Projects
Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Construction Services for Poitras East Community Development District
Post-Bid
FL

Portland Cement and General Contractor
Results
Less than $14,102,991 est. value
FL

Thompson Valley Road Resurfacing Project
Results
Less than $1,100,000 est. value
Monticello, FL

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

Smith Creek Road Widening and Resurfacing Project
Results
Crawfordville, FL 32327

FDOT SCOP 2019 Carter Rd./NE 1st St. Roadway Improvements
Results
Less than $450,000 est. value
Lawtey, FL

Silver Springs Acres Road Grading
Term Contract
Results
Less than $38,000 est. value
FL

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

Bayou Drive Shoulder Repair
Results
FL

NW 32nd Ave Resurfacing
Results
Less than $900,000 est. value
FL

Last Updated 02/21/2020 09:16 AM
Project Title

Old Kings Road Widening: Phase 1

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32135   (Flagler County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,745,613
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the widening and resurfacing of Old Kings Road from a 2-lane undivided roadway to a 4- lane divided roadway with curb and gutter, raised curbed grass medians and 8’ wide sidewalks. The proposed lane widths are 11 feet wide. The project limits are from the southern intersection of Kingswood Drive to east of Kings Way Road. The project is approximately 0.661 miles. The project is an off-system project with no impact on any on-system roads. Improvements during roadway construction include: clearing and grubbing, removal of existing concrete, excavation, embankment, type B stabilization, optional base, asphalt construction, milling and resurfacing, signing and pavement markings, sodding, maintenance of traffic, traffic separator, curb and gutter, guardrail removal, detectable warning surfaces, gravity walls, end walls, pipe handrail, pedestrian/bicycle railing, lighting, landscaping, irrigation, reconstruction of concrete sidewalks (6” and 4” thick), mailbox relocations, and erosion control. Drainage modifications include installation of pipe culverts, manholes, inlets, mitered end sections, and regrading of swales. Improvements to the intersections at Old Kings Road and Palm Coast Parkway and Old Kings Road and Celico Way include installation of mast arms, traffic signals, pedestrian features, conduit, directional bore and installation of pull and splice boxes

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents