Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 est. value
Orange, CA 92869

Modify Existing Traffic Signals for Improved Visibility, Add Safety Lighting, Refresh Pavement Delineation
Infrastructure
Design
$2,140,000 est. value
Santa Ana, CA 92799

Reconstruct Curb Ramps and Cold Plane Pavement With RHMA
Infrastructure
Bidding
$11,500,000 est. value
Laguna Beach, CA 92652

Frank R. Bowerman Phase VIII - A1 Groundwater Protection
Infrastructure
Bidding
$60,000,000 est. value
Irvine, CA 92602

Arterial Sidewalk Removal and Replacement at Various Locations Phase Six
Infrastructure
Post-Bid
$350,000 est. value
Anaheim, CA

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

Annual Sidewalk And Curb Access Ramp Improvements
Alteration
Results
$290,000 est. value
La Habra, CA 90632

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

Bristol Street (Bear Street to Santa Ana Avenue) Bicycle Facility - City of Costa Mesa
Infrastructure
Conception
$525,000 est. value
Costa Mesa, CA

Bake Parkway at Baffin Bay Median Improvement Project
Infrastructure
Bidding
$50,000 est. value
Lake Forest, CA 92630

Glen Mar Frontage Road Beautification Project
Infrastructure
Post-Bid
Huntington Beach, CA 92646

Turtle Rock Community Park Parking Lot Rehabilitation
Infrastructure
Results
$680,000 est. value
Irvine, CA 92606

Tewinkle Park Lakes Upgrades - 700137 - City of Costa Mesa
Infrastructure
Conception
Less than $1,000,000 est. value
Costa Mesa, CA 92626

Reported 06/24/2022 08:30 AM
Project Title

Adams Avenue Active Transportation Project - City Of Costa Mesa

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA 92626   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide undergrounding sidewalk and bike trail by utilities and power poles along Adams Avenue from Mesa Verde Drive West to Albatross Drive per SCE Rule 20A and 20B guidelines. The project is included in the City of Costa Mesa's FY 2022-2026 Capital Improvement Program (CIP). As of June 23, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated from 2022 to 2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents