Similar Projects
AGE of Central Texas - South Campus
New Construction - 19,514 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78748

Holcomb Family YMCA
New Construction - 12,160 SF
Design
$4,500,000 est. value
TX 77386

New Restroom and Concession Building at BMX Park
New Construction
Sub-Bidding
DeSoto, TX 75115

Build Bus Stops for Transit
Term Contract
Post-Bid
Port Arthur, TX 77640

Construction of an Athletic Storage Facility
Post-Bid
Snook, TX 77879

Boys Ranch Park - Phase Next
Results
$60,000,000 est. value
Bedford, TX

Beaver Fit Sunpro Structure Ft Sam Houston Jimmy Brought
Results
Houston, TX 78234

Mueller Town Center Pavilion
New Construction - 12,707 SF
Construction
Austin, TX 78723

Traylor Stadium Press Box Replacement
Construction
Less than $4,157,000 est. value
Rosenberg, TX 77471

Fisherman's Park Wheeled Sports Plaza - Phase 1
Post-Bid
$290,000 est. value
Bastrop, TX 78602

Beaver Fit Sunpro Structure Ft Sam Houston METC
Results
San Antonio, TX 78234

Shield Ranch - El Ranchito
New Construction - 10,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78738

Lewisville High School Athletics Package 1 (Turf Replacement and Baseball Pressbox)
Post-Bid
Lewisville, TX 75067

Beaver Fit Sunpro Structure Camp Bullis
Results
San Antonio, TX 78257

Construct NTTC Trainer (Shoot House)
New Construction
Construction
$1,000,000 to $5,000,000 est. value
TX 78236

Last Updated 05/18/2021 10:41 AM
Project Title

Stadium Pressbox Improvements

Physical Address View project details and contacts
City, State (County) Joaquin, TX   (Shelby County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove and dispose of existing metal press box sitting on the existing steel structure and deck. 2. Inspect and repair or replace any weak structural framing in the support system. 3. Build new 45’ x 8’ x 8’ press box on existing steel structure and deck with 6 double windows across front, 2 steel entrance doors—one on each end. 4. Exterior finished in 26 gauge PBR steel panels with insulation and a platform roof. 5. Build Stairs to upper level on roof deck for videographers and install chain link fence around the perimeter of the platform roof. 6. Divide press box into four finished rooms with main entrances at each end. 7. Interior finished with plastic wall panels, sealed doors, and vinyl flooring. 8. All lighting, electrical, counters, doors, windows and finishes included. 9. Provide samples of steel exterior metal to be used with proposal. 10. Color choices for all exterior and interior products to be made by owner. 11. Provide details and terms of warranty of contractors work.

Details

Division 13 - Special Construction, Athletic and Recreational Special Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents