Similar Projects
Chip and Seal
Infrastructure
Bidding
$117,000 est. value
Salem, MO

Fox Hollow Drive - Street Paving
Infrastructure
Bidding
$300,000 est. value
Shell Knob, MO 65747

Parking Lot Resurfacing
Infrastructure
Post-Bid
Mexico, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Northwest Boulevard Pavement Preservation
Infrastructure
Results
MO

2021 Micro Surfacing
Infrastructure
Results
$337,415 est. value
Blue Springs, MO

Asphalt - Plant Pick Up Only - Multi Year
Term Contract
Post-Bid
Columbia, MO

Major Street Resurfacing
Infrastructure
Results
Springfield, MO

Pre-cast Concrete Box Culvert
Infrastructure
Post-Bid
Lebanon, MO

CR 304 Reclamation Project
Infrastructure
Results
MO

2022 Mill and Overlay Program
Infrastructure
Post-Bid
$300,000 est. value
Gladstone, MO

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Reinforced Concrete Box Storm Detention System
Infrastructure
Results
Kansas City, MO

Resurface
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

Pavement Repair and Diamond Grinding From 0.9 mile East of Route
Infrastructure
Results
$500,000 to $750,000 est. value
MO

Last Updated 07/01/2022 01:31 PM
Project Title

Box Culvert Improvements

Physical Address View project details and contacts
City, State (County) Buffalo, MO 65622   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: This project will consist of replacing two box culverts, stormwater connections to the new culverts, roadway removal and repair, stream bed remediation and associated grading to complete installation. Major components include: a. Installation of dual 4’ x 10’ box culvert at the Main Street crossing b. Installation of dual 3’ x 12’ box culvert at the Jefferson Street crossing c. Installation of 24” HDPE stormwater piping for connection to the Main Street culverts d. Installation of rip-rap streambed stabilization. e. Sawcut, removal and replacement of asphalt pavement as necessary for box culvertinstallation f. Removal and replacement sidewalk as necessary for box culvert installation g. Ensuring existing utilities are protected.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents