Similar Projects
Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

Optima 15615
New Construction
Conception
Scottsdale, AZ 85254

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

The Blue
New Construction - 681,000 SF
Design
$146,000,000 est. value
Phoenix, AZ 85004

Design/Build - Litchfield Square Parking Garages
New Construction
Bidding
$360,000 est. value
Litchfield Park, AZ

North Corporation Yard (NCY) Parking and Solar Design Build
New Construction
Results
$5,700,000 est. value
Scottsdale, AZ

The Collective
New Construction - 6,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tempe, AZ 85281

City Creek Mixed Use Development
New Construction - 31,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Mesa, AZ 85210

Modera Kierland
New Construction, Renovation - 893,600 SF
Pending Verification
Phoenix, AZ 85054

Pier 202
New Construction - 711,000 SF
Pending Verification
$1,800,000,000 est. value
Tempe, AZ 85281

Sycamore Station - Master Plan
New Construction
Conception
Mesa, AZ 85201

Paradise Valley Mall Redevelopment
New Construction - 4,500,000 SF
Design
$6,500,000 est. value
Phoenix, AZ 85032

Haverly Apartments
New Construction - 536,141 SF
Construction
$55,116,585 est. value
Phoenix, AZ 85012

Tempe Depot
New Construction, Demolition, Infrastructure - 334,600 SF
Pending Verification
$10,000,000 CJ est. value
Tempe, AZ 85281

East Garage Security Office Renovation
Renovation
Conception
$306,500 est. value
Phoenix, AZ

Reported 05/03/2022 09:43 AM
Project Title

Y1DZ--Expand Parking Garage (Va-19-00036525) (Va-19-00104977)

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

he purpose of this project is to improve veteran s experience at the Phoenix Veterans Administration Health Care System by adding 389 parking spaces to the current available in the on-site parking garage. Feasibility efforts have determined the optimal option to achieve this goal is to expand the existing PVAMC parking garage and improve the overall efficiency of the combined structure. The existing structure was designed for future expansion, where mandrel connections can be placed on the west and north faces. Due to space constraints, it has also been determined that the north end expansion be built over a future underground storm water detention basin. Improvements to the current PVAMC storm water system are being addressed in a separate design project, but the design will not be complete by the time construction for the parking garage expansion will begin. Retention basin 1 (RB1) is where a majority of the campus storm water collects and is the location of the planned underground storm water storage tanks. RB1 frequently overfills since it does not percolate as expected by design. This causes flooding to numerous areas of the campus and requires grounds crews to manually pump water to other areas. It is critical that the underground storm water storage at RB1 be designed and built to detain storm water with a positive connection to the City of Phoenix (COP) storm water system prior to, or during, the construction of the parking garage expansion by the parking garage expansion design-build team. The contractor shall provide the complete design and subsequent construction of expanding the parking garage and storm water retention basin.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents