Similar Projects
Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Bay Shore, Brockport, Brooklyn, Camillus, Canandaigua, Chester, Cortland, Farmingdale, Glenmont, Halfmoon, Hamburg, Herkimer, Hicksville, Ithaca, Medford, Middletown, New Hartford, Norwich, Oneida, Oneonta, Oswego, Potsdam, Rochester, Vestal, Williamsville, Yonkers, NY

Sidewalk
Post-Bid
Less than $550,000 est. value
Brockport, NY 14420

Long Pond Sidewalk Repair
Results
Less than $50,000 est. value
Rochester, NY 14626

Trail Transformation Phase 1
Results
$3,000,000 to $5,000,000 est. value
Scottsville, NY 14546

Replacement of Curbs, Sidewalk and Parking Lot Paving
Post-Bid
$250,000 to $500,000 est. value
Rochester, NY

Lena Gantt Site Improvements
Results
Rochester, NY 14611

Gates Fire District - Station 1 and 3 Parking Improvements Project
Post-Bid
Rochester, NY

Hazardous Sidewalk Replacement Program NW Quadrant 2020 Phase 1
Results
Less than $992,000 est. value
Rochester, NY 14614

Pedestrian Safety Action Plan
Post-Bid
$1,538,400 est. value
Rochester, NY

Monroe 2 - Orleans BOCES Facade and Parking Lot Renovation
Results
Less than $2,194,900 est. value
Spencerport, NY 14559

Furnish and Install Sidewalk Curb Ramps
Term Contract
Results
Rochester, NY 14614

Ridge Road Multi-Modal Corridor Project
Results
Webster, NY

Greece Public Library – Parking Lot Expansion
Results
Greece, NY 14612

Infrastructure Improvements, North Campus 2A Residential Quad at SUNY Brockport
Results
$5,000,000 to $10,000,000 est. value
Brockport, NY 14420

Main Street Sidewalk and Curb Improvements (Phase 1)
Results
Less than $90,000 est. value
Spencerport, NY 14559

Last Updated 07/22/2020 03:02 PM
Project Title

Spring Lake Trail

Physical Address View project details and contacts
City, State (County) Fairport, NY 14450   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of constructing approximately 2,100 LF of stone dust trail that follows an existing informal footpath between Spring Lake Park in the Town of Perinton and Channing Philbrick Park in the Town of Penfield. Approximately 300 LF of stacked heavy stone armament will be installed to provide streambank stabilization along a heavily eroded portion of Irondequoit Creek. The project also includes construction of a small timber framed structure (5’-11” wide with 4 – 10’ spans) along the trail route to span an overflow channel.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents