Similar Projects
Last Updated | 08/22/2022 01:07 PM |
Project Title | Johnsonville Elementary School Addition/Renovation Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Cameron, NC 28326 (Harnett County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,000,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 22, 2022, the project has been awarded. A timeline for construction has not been confirmed. Work of the Project includes construction of the Johnsonville Elementary School; a one-story, 17,405 square foot building and connecting corridors, slab on grade, masonry load-bearing structure with cavity wall construction with brick veneer exterior walls, CMU and GWB interior walls, steel trusses and joists, and both single membrane and standing seam metal roofs. Interior finishes of painted CMU and gypsum board on metal studs, acoustical tile ceilings, VCT floors, aluminum windows with insulated glass, hollow metal door frames and wood doors. Related site work will include pavement access drives for vehicular traffic and concrete sidewalks. This project includes asbestos containing materials and lead paint as part of the demolition requirements. Refer to the project construction documents for all reports and regulatory procedures. All questions after that time shall be submitted via email to the Design Consultant at SfL+a Architects, 333 Fayetteville Street, Suite 225, Raleigh, North Carolina 27601 via email to: johnsonville@sfla.biz Each proposal shall be accompanied by a Bid Guarantee of five percent (5%) of the bid in cash, certified check or a fully executed Bid Bond. The deposit shall be retained by the Owner if the successful bidder fails to execute the contract within ten (10) days after award or fails to give satisfactory surety as required herein. (General Statutes of North Carolina, Chapter 143, Article 8, Section 129.) No bid may be withdrawn for a period of ninety (90) days after the opening thereof. The successful bidder will be required to furnish 100% Performance Bond and a 100% Labor and Material Payment Bond. Bidders are required on school construction and renovation projects covered by N.C. Gen. Stat. 143-128 to make a good faith effort to meet minority participation goals. Bidders shall identify on its bid the minority businesses that it will use on the project. Bidders shall submit along with the bid an affidavit listing the good faith efforts it has made pursuant to subsection (f) of G.S. 143-128.2 and the total dollar value of the bid that will be performed by the minority businesses. A bidder that performs all of the work under the contract with its own workforce may submit an affidavit to that effect in lieu of the aforementioned affidavit otherwise required under this subsection. The Harnett County Schools reserves the right to reject any and all bids, waive informalities and irregularities in bidding, and to accept bids that are considered to be in the best interest of the School System. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The range is $7,000,000 to $8,000,000 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 17,405 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |