Similar Projects
Rainbow Valley Final Planned Area Development
New Construction
Conception
$2,000,000,000 est. value
Goodyear, AZ 85338

Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Union at Roosevelt - Phase II Apartments
New Construction - 59,304 SF
Sub-Bidding
Phoenix, AZ 85004

Cerro Vista
New Construction - 2,094 SF
Post-Bid
Avondale, AZ 85018

Vista Ridge Apartments
New Construction - 4,818,732 SF
Post-Bid
$10,000,000 CJ est. value
Phoenix, AZ 85041

Foothills Village Apartments
Renovation - 5,822,433 SF
Results
Phoenix, AZ 85041

Foothills Village Apartments
Renovation - 5,822,433 SF
Results
Phoenix, AZ 85041

Apache Rock Apartments f/k/a Daybreak Apartments
New Construction - 75,193 SF
Construction
$3,500,000 est. value
Tempe, AZ 85281

Blocks on Roosevelt
New Construction - 18,285 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Phoenix, AZ 85004

Parkwest Building - Building E
Renovation - 1,385 SF
Pending Verification
Peoria, AZ 85345

Astra Phoenix
New Construction - 2,005,000 SF
Pending Verification
$480,000,000 est. value
Phoenix, AZ 85003

Optima 15615
New Construction
Conception
Scottsdale, AZ 85254

Upland Rv and Boat Storage
New Construction - 600 SF
Design
Less than $500,000 CJ est. value
Buckeye, AZ 85326

Last Updated 05/09/2022 11:51 AM
Project Title

Palm Tower

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85004   (Maricopa County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Office, Parking Garage
Contracting Method
Project Status Construction Commenced March 2022, Construction Completion Expected second quarter 2024
Bids Due View project details and contacts
Estimated Value $8,352,485
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

79,190 SF - Office, 30,000 SF New Construction, 1 Apartments/Condominiums, 29 Stories Above Grade, 49,190 SF New Construction 354 Unit(s), 1.30 Acres, Parking Garage, 7 Stories Above Grade, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents