Similar Projects
Sacramento Weir Widening Construction Project
Alteration
Design
$100,000,000 to $250,000,000 est. value
West Sacramento, CA 95691

Contractor - Replace Hyde Street Pier
Infrastructure
Design
$10,000,000 est. value
San Francisco, CA

Berths 7 and 8 Fender Replacement and Structural Improvements
Infrastructure
Bidding
$1,000,000 est. value
Stockton, CA 95203

Boat Yardwork, Maintenance and Repair
Infrastructure
Bidding
San Diego, CA

Suisun Marina Dock Box Replacement Project
Alteration
Post-Bid
$225,000 est. value
Suisun City, CA

Pavement Maintenance and Repairs
Alteration
Post-Bid
$700,000 to $800,000 est. value
Solana Beach, CA

Antioch Marina Boat Launch Ramp Dock Repair
Infrastructure
Results
$152,000 est. value
Antioch, CA 94509

Installation of Ada Access Ramps at Various Locations
Alteration
Results
$99,000 est. value
Loma Linda, CA

Military Ocean Terminal Concord (MOTCO) Boat Ramp
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Floating Dock Replacement at New Melones Lake
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
CA

Residential Street Repair Program
Infrastructure
Results
Santa Ana, CA

NBSD Graving Dock Keel Blocks
Term Contract
Post-Bid
San Diego, CA

Stearns Wharf Annual Maintenance and Repairs for 2022
Term Contract
Results
$187,688 est. value
Santa Barbara, CA 93109

Decking and Railing Rehabilitation on the Floating Walkway at Neary Lagoon
Infrastructure
Post-Bid
$80,000 est. value
Santa Cruz, CA

Reported 06/04/2022 12:00 AM
Project Title

Z--Golden Gate National Recreation Area - Stabilize Alcatraz Wharf

Physical Address View project details and contacts
City, State (County) San Francisco, CA   (San Francisco County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include repair of the historic, steel-cased concrete piles, concrete beams, and concrete slabs. These elements are in fair to poor condition, with varying degrees of damage. Two new seismic resisting elements will be installed to bring the wharf up to a seismic Risk Category III structure. Concrete repairs and seismic improvements will be undertaken in a single phase of construction. Subject to availability of funds of a separately tracked project, GOGA 312663A Repair Finger Pier and Moveable Gangway at Alcatraz Island, a set of construction contract options will also include repairs to the finger pier. The finger pier is connected to/an extension of the concrete wharf. The project will repair or replace the existing wooden fender and bearing piles, cross bracing, gangway ramp landing and motorized pulley system, to match the existing.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents