Similar Projects
SDIA - Airport Administration Building - Manlift
New Construction, Alteration - 130,000 SF
Post-Bid
San Diego, CA 92108

Fitness Equipment
Term Contract
Post-Bid
San Diego, CA 92101

Class V Forklift for Central Stores
Alteration
Results

Cafeteria Ovens and Installation
Alteration
Results
$100,000 est. value
Chula Vista, CA 91911

Automated Solvent Evaporation System
Renovation
Post-Bid
$60,000 CJ est. value
San Diego, CA 92123

Fire and Intrusion Alarm Ocotillo Wells State Vehicular Recreation Area (SVRA)
Renovation
Results
$97,098 CJ est. value
Borrego Springs, CA 92004

Kitchen Equipment Purchase and Installation
Term Contract
Post-Bid
San Diego, CA 92101

Furnishing Butterfly Valves For The Wadsworth Bypass Pipeline, Inland Feeder-Rialto Pipeline Intertie, And Badlands Tunnel Isolation Surge Tanks
Alteration
Results
$5,000,000 to $7,000,000 est. value

Networking Equipment Cisco Brand Only
Term Contract
Post-Bid
Oceanside, CA 92054

Sprinter Operations Facility (SOF) Dispatch System Refurbishment
Renovation
Results
$19,000 CJ est. value
Escondido, CA 92025

Audio Visual Equipment and Supplies
Term Contract
Post-Bid
San Diego, CA 92128

Orange and Green Line Sign Replacement Fabrication
Infrastructure
Results
$41,887 CJ est. value
San Diego, CA 92101

Ramona Tower Air Traffic Control Tower Data and Communications Equipment
Term Contract
Post-Bid
Ramona, CA 92065

SOF and BOW Solar Inverter Replacement
Renovation
Results
$258,745 CJ est. value
Oceanside, CA 92054

Networking Equipment and Installation at Various Sites
Term Contract
Post-Bid
Chula Vista, CA 91910

Last Updated 06/30/2023 06:02 PM
Project Title

OUSD Ivey Ranch ES Glulam Beam Repair

Physical Address View project details and contacts
City, State (County) Oceanside, CA 92057   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $144,245 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Article includes requirements for the diversion by the Contractor of construction and demolition debris from landfills. The Contractor shall develop and implement a Waste Management Plan as specified herein. The Contractor shall take a pro-active, responsible role in the management of construction and demolition waste and require all subcontractors, vendors, and suppliers to participate in the effort. 2) The District has established that this Project shall generate the least amount of waste practicable and that processes shall be utilized that ensure the generation of as little waste as possible due to over-packaging, error, poor planning, breakage, mishandling, contamination or other factors. 3) As much of the waste materials as economically feasible shall be reused, salvagedor recycled. Waste disposal in landfills shall be minimized. 4)The Contractor is encouraged to use waste hauling companies that separate recyclable materials. The Contractor shall work with its waste haulers in providing other recycling methods as appropriate. 5) The Contractor is responsible for implementation of any special programs involving rebates or similar incentives related to the recycling of waste. Revenues or other savings obtained for salvage or recycling accrue to the Contractor. Bid proposals shall be accompanied by a certified or cashier's check or bid bond for an amount not less than ten percent (10%) of the bid amount, payable to the District. A bid bond shall be secured from an admitted surety company, licensed in the State of California, and satisfactory to the District. The bid security shall be given as a guarantee that the bidder will enter into the Contract if awarded the work, and in the case of refusal or failure to enter into the Contract within ten (10) calendar days after notification of the award of the Contract or failure to provide the payment and performance bonds and proof of insurance as required by the Contract Documents, the District shall have the right to award the Contract to another bidder and declare the bid security forfeited. The District reserves the right to pursue all other remedies in law or equity relating to such a breach including, but not limited to, seeking recovery of damages for breach of contract. Failure to provide bid security, or bid security in the proper amount, may result in rejection of the bid.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents