Similar Projects
Remove, Furnish and Install a New Air Compressor at Fire Station 1
Alteration
Bidding
$95,000 est. value
Dracut, MA 01826

Newton North High School Chiller and Related Equipment Service
Alteration
Bidding
Newton, MA 02460

Maintenance and Repair of HVAC for Various Schools
Post-Bid
Everett, MA

Station 4 Air Conditioning Project
Post-Bid
Less than $125,000 est. value
Reading, MA 01867

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Purchase and Install HVAC Ionization and UV System Upgrades at Library Facilities
Post-Bid
Concord, MA

Watertown Police Department Firing Range HVAC Upgrades - General Bids
Results
Less than $450,000 est. value
Watertown, MA

HVAC Air System Rebalancing
Post-Bid
$150,000 est. value
Chelmsford, MA

Watertown Police Department Firing Range HVAC Upgrades - Filed Sub Bids
Results
$425,000 est. value
Watertown, MA 02472

Barbieri Warehouse Rooftop Unit
Post-Bid
$300,000 est. value
Framingham, MA

Mercier Center HVAC Renovation
Results
Less than $58,500 est. value
Lowell, MA 01854

Air Vent Cleaning of Aviation Hangars
Post-Bid

Plumbing/Heating Maintenance and Repairs Service Contract
Term Contract
Results
Less than $30,000 est. value
Dracut, MA 01826

HVAC and Mechanical Products
Term Contract
Post-Bid

Reported 04/21/2022 12:00 AM
Project Title

Hot Water Boiler Replacement and HVAC Controls Upgrade

Physical Address View project details and contacts
City, State (County) Hopkinton, MA 01748   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from Copy Center - 03/30/22
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Hopkinton Middle School Hot Water Boiler Replacement and HVAC Controls Upgrade The work under the Contract consists of: (1.) Complete removal of Boilers, Pumps, Expansion Tank, Air Separator, Controls, gas Piping, Hot Water piping and related appurtenances as described in the Contract Drawings. (2.) Removal of Existing Control surfaces (Dampers, Valves, etc), controllers, and associated accessories related to the controls work as described in the Contract Drawings. (3.) Installation of new Condensing hot Water boilers, Pumps, VFDs, Expansion tanks, Air Separator, Controls, Gas Piping, Hot Water Piping and related Appurtenances. (4.) Installation of Exhaust Fan, Differential pressure sensors, and Ventilation dampers as depicted in the Contract Drawings. (5.) Installation of new HVAC controls, Controllers, Dampers, Actuators, and Valves as depicted in the Contract Drawings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents