Similar Projects
Flood and Drainage Improvements
Bidding
$216,000 to $237,600 est. value
Laurelville, OH

Precast Concrete Headwalls
Post-Bid

Burton Hill Road Landslide Repair
Post-Bid
Less than $184,660 est. value
Logan, OH 43138

Box Culverts
Results

Concrete Pipes
Results

Jacking and Boring Services
Post-Bid

Precast Catch Basins, Risers, and Grates
Term Contract
Results

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

Miscellaneous - Culverts FY2020A
Results

Walnut Street Flood and Drainage Improvements Project
Post-Bid
$736,000 to $809,600 est. value
Logan, OH 43138

UPC South 2020
Results
Less than $107,650 est. value

County Road Number 333 Moore Road Landslide Repair
Results
Less than $195,741 est. value
Logan, OH 43138

Reventment Bags and Erosion Control Mats
Results

Culvert Invert Paving
Term Contract
Results

Culvert Replacement - SR 56-17.47
Results
OH

Last Updated 11/20/2019 03:19 PM
Project Title

Combo Hocking County Stream Captures

Physical Address View project details and contacts
City, State (County) OH   (Hocking County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $166,349
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description The Combo Hocking County Stream Captures project will mitigate six abandoned mine features in Ward Township. This project will occur at four different sites. Each site will be accessed from Jobs-New Pittsburg Road west of Murray City. The sites are as follows: Brush Fork J-Hook Stream Capture, HC-Wr-46 (1 Mine Opening) This site will require the installation of one Light Duty Bate Gate, an earthen berm and a rock lined channel and will eliminate a stream capture. Access will be via Oil & Gas access roads and abandoned logging roads. Brush Fork Vertical Stream Capture, HC-Wr-47 (1 Vertical Mine Opening, 1 Subsidence) This site will require the installation of Polyurethane Foam (PUF) inside a vertical opening and an Encapsulated Aggregate Plug (EAP) in the subsidence and will eliminate a stream capture. Additionally, stream channel will be constructed from the abandoned mine features to the JobsNew Pittsburg road drainage system. Brush Fork Horizontal Stream Capture, HC-Wr-48 (2 Mine Openings) The Horizontal Stream Captures are separated into two sites, 1 & 2. Each mine opening will be closed with PUF and a stream channel will be constructed over the sealed opening eliminating two stream captures. The stream channels will be connected to down-stream tributaries. Each site will be accessed by a common staging area. Brush Fork School Bus Stream Capture, HC-Wr-49 (1 Mine Opening) This site will require a temporary stream crossing, excavation on steep grades, backfilling a mine opening with on-site soil, constructing a stream channel and will result in the elimination of one stream capture. The stream channel will connect to Brush Fork.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents