Similar Projects
I-59 Widening
Infrastructure
Conception
Less than $50,000,000 est. value
Trussville, AL 35173

The Tracks
New Construction, Infrastructure
Design
$41,000,000 est. value
Birmingham, AL 35233

Shades Creek Greenway Multi-Purpose Trail - Phase Two (Grading, Drainage, Pavement, Pedestrian Bridge, Boardwalk, Signage, and Landscaping)
New Construction, Infrastructure
Bidding
$4,790,453 to $5,854,998 est. value
Homewood, AL 35209

Terrace Manor Roadway Improvement Project
Infrastructure
Bidding
$300,000 est. value
Bessemer, AL 35022

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

18Th Place South Improvements
Post-Bid
Homewood, AL

County Road 7 Roadway Failure Repair
Results
$559,865 est. value
Birmingham, Oneonta, AL 35244

Constructing the Planing, Resurfacing, and Traffic Stripe
Results
$1,293,167 to $1,580,537 est. value
Birmingham, AL 35232

Homewood Public Library Parking Lot Paving
Infrastructure
Post-Bid
Homewood, AL 35209

Constructing Pavement Rehabilitation and Guardrail Safety Improvements (Planing, Resurfacing, Guardrail Installation, and Traffic Stripe)
Results
$4,273,048 to $5,222,615 est. value
Fultondale, AL 35068

Farmers Market Access Road Improvements
Infrastructure
Post-Bid
Birmingham, AL

Constructing Planing, Resurfacing, Bridge Rail Retrofit, and Traffic Stripe
Results
$1,490,261 to $1,821,430 est. value
Trussville, AL

Asphalt (Emulsified)
Term Contract
Post-Bid
Birmingham, AL

Constructing the Pavement Preservation (Planing, Concrete Joint Repair, Resurfacing, and Traffic Stripe)
Infrastructure
Results
$6,375,331 to $7,792,072 est. value
AL

Asphalt (Plant Mix)
Term Contract
Post-Bid
Birmingham, AL

Reported 07/14/2022 12:57 PM
Project Title

Bell Hill Road Widening- County of Jefferson

Physical Address View project details and contacts
City, State (County) Bessemer, AL 35021   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2023, Construction Completion Expected October 2024
Bids Due View project details and contacts
Estimated Value $6,000,000 to $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Road Widening and intersection improvements for Bell Hill Road. As of May 18, 2022, this project is in the design phase. An engineer has been selected for the project. Although a firm timeline for construction has not been determined, bidding is not expected to start prior to fall of 2022 and construction is not expected to start prior to early 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents