Similar Projects
Martin Downs Water Treatment Plant
Renovation, Addition
Conception
$13,500,000 est. value
Palm City, FL 34990

Buenaventura Lakes Water Treatment Plant Upgrade & Improvements
Addition
Conception
Kissimmee, FL

Wastewater Treatment Plant and Associated Appurtenances
Design
FL

Southern Region Water Reclamation Facility Process Improvements
Renovation, Addition
Design
$17,500,000 to $22,500,000 est. value
Boynton Beach, FL 33437

Lime Slaker System
Bidding
Less than $750,000 est. value
Pompano Beach, FL 33064

Water Treatment Plant No. 2 Treatment and Disposal Improvements Design Package 1, 3 and 4 WUD
New Construction
Bidding
West Palm Beach, FL

Mid-County Waste Water Treatment Plant Headworks
New Construction
Post-Bid
$5,000,000 est. value
Dunedin, FL 34698

RGF Water Treatment Units Services
Post-Bid
Homestead, FL 33039

Tindall Hammock Irrigation and Soil Conservation District Water Treatment Plant Improvements Phase 2
Term Contract
Results
Less than $572,000 est. value
Davie, FL 33314

Water Treatment Program for Chilled Water Plants
Term Contract
Results
Jacksonville, FL

CR 136 / I-75 Water Treatment Plant
Construction
FL

Water Treatment Plant Operations Building Reconstruction and Remodel
Construction
Less than $2,400,000 est. value
Panama City, FL 32404

East Plant Upgrades/Improvements
Renovation
Pending Verification
$5,247,000 est. value
Clearwater, FL

Groundwater Replenishment Facility
New Construction
Pending Verification
$34,258,000 est. value
Clearwater, FL

Tropical Farms Wastewater Plant
Renovation
Design
$4,100,000 est. value
Stuart, FL 34997

Last Updated 01/25/2022 12:08 PM
Project Title

Wastewater Treatment Plant No. 2 Expansion

Physical Address View project details and contacts
City, State (County) Palm Coast, FL   (Flagler County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $18,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of WWTP No. 2 expansion from 2.0 MGD to 4.0 MGD will generally include but is not limited to the following components: (a). Headworks: grit removal, drum screen; and odor control; (b). Flow equalization tanks with aeration and mixing equipment and flow equalization pumping system; (c). AWT biological treatment process using MBR, including anaerobic basins, pre-anoxic basins, aerobic basins, post-anoxic basins and MBR basins; (d). Chlorine contact chambers; (e). Reclaimed water transfer pumps; (f). Sludge holding tanks and associated aeration and mixing system and pumping equipment; (g). Chemical feed systems for alum, Micro-C, and sodium hypochlorite; (h). All the associated structural, electrical and control system to make the project completed as designed. Join Zoom Meeting https://zoom.us/j/94365506845?pwd=dEJOSEx0eHhnb2tCNllLeTYyUFA3QT09 Meeting ID: 943 6550 6845 Password: dk42d5

Details

Water Treatment Plant, 210,476 SF Addition.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents