Similar Projects
New Huntington Middle School & Community Center
New Construction
Conception
$57,000,000 est. value
Newport News, VA

Future Western High School
New Construction
Conception
$157,707,000 est. value
VA

Original Mount Vernon High School Renovation and Adaptive Reuse
Renovation
Design
$55,000,000 to $81,000,000 est. value
Alexandria, VA 22309

Hermitage and Highland Springs ACE Centers Renovations
New Construction, Renovation - 145,000 SF
Design
$53,000,000 est. value
Henrico, VA 23228

Hollymead Elementary and Walton Middle Schools Restrooms Finishes Upgrades
Renovation
Bidding
$130,000 to $150,000 est. value
Charlottesville, VA 22911

Restroom Renovations at 3 High Schools
Renovation
Bidding
Chilhowie, Marion, Saltville, VA 24354

Construction Manager Advisory Services for Various Arlington Public Schools Construction Projects
Post-Bid
Arlington, VA

Renovation of CTE Lab and New Switch Gear
Renovation
Post-Bid
Dublin, VA 24084

PPEA for Design-Build of New High School
New Construction
Results
South Boston, VA 24592

Churchland Middle School and Woodrow Wilson High School - ADA Restroom Renovations
Results
Portsmouth, VA

Construction of the Westmoreland High School Replacement (Washington and Lee)
Construction
$44,500,000 est. value
Montross, VA 22520

Cooper Middle School Renovation Project
Renovation - 179,650 SF
Construction
McLean, VA 22101

New Career Center
New Construction
Pending Verification
$150,000,000 to $170,000,000 est. value
Arlington, VA 22204

New High School
New Construction
Pending Verification
$120,000,000 est. value
South Boston, VA

Centreville High School Renovations
Renovation
Conception
$146,789,200 est. value
Clifton, VA 20124

Last Updated 03/28/2022 09:15 AM
Project Title

George Washington High School

Physical Address View project details and contacts
City, State (County) Danville, VA 24541   (Danville City County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced March 2022
Bids Due View project details and contacts
Estimated Value $80,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents