Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$574,920 CJ est. value
Mercer, PA 16137

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

SR 3022 Bridge over the Shenango River
Infrastructure
Bidding
$1,000,000 CJ est. value
Transfer, PA 16154

SR 3022 Bridge over the Shenango River
Infrastructure
Bidding
$1,000,000 CJ est. value
Transfer, PA 16154

Gurrera Village Concrete Sidewalk Replacement
Infrastructure
Post-Bid
Hermitage, PA 16148

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Asphalt Milling Wearing Course
Results
Grove City, PA

Paving Improvements at Grove City Area High School
Infrastructure
Results
Grove City, PA 16127

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

PA 718: Middlesex Rd to Broadway Ave
Infrastructure
Bidding
$2,500,000 CJ est. value
Sharon, PA 16146

Last Updated 01/04/2023 07:42 AM
Project Title

State Street Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Hermitage, PA 16148   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,006,200 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On SR 3008 from Boyd Dr. to SR 18. Also North and South on SR 3025 approx. 300' from the intersection of 3008 in the City of Hermitage. As of January 04, 2023, the project is in development stage. Anticipated letting date is February 02, 2023. PennDOT - State Street Pedestrian Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents